TEXAS · WELLS · HEMPHILL COUNTY · API 42-211-30304 · DISTRICT 08

Campbell #B 1

Y

Hemphill County · Mendota NW. (Granite Wash) field · Producing  · Vertical

Campbell #B 1 (API 42-211-30304) is a well in Hemphill County operated by Mmgl Txph LLC, completed October 28, 2007 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued September 4, 2007, permitted to 12,225 ft.

It was permitted by Samson Lone Star, LLC and has since transferred to Mmgl Txph LLC on the wellbore schedule.

No lease production has been reported under this well’s leases.

Operator of record

Mmgl Txph LLC

Permitted by Samson Lone Star, LLC; the EWA schedule now lists a different operator.

Based in
Dallas, TX
P-5 status
Active (A)
P-5 last filed
Jul 24, 2025
Permits on file
10
Phone
(972) 701-8377

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleSamson Lone Star LLC
Production reportsMmgl Txph, LLCthrough Apr 2026
Latest permitSamson Lone Star, LLCSep 4, 2007

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

12,225
total depth, ft
1
permits on file
Sep 4, 2007
last permit issued
Oct 28, 2007
completed
0
cumulative oil, bbl
821K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Oct 28, 2007
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active – Extension (X)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Campbell G-14-232885Mendota, NW. (Granite Wash)Mmgl Txph, LLC10356KOct 2007 – Jul 2026
Campbell, J. W. G-14-59608Mendota, S. E. (Morrow Upper)Samson Lone Star, LLC10465KJan 1993 – Oct 2007

Gas, mcf lease total

Last 12 months 7,989 · prior 12 7,823(+2%)

05001K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Grace Petroleum Corp.Jan 1993 → Jan 1993
  2. 2Samson Resources CompanyFeb 1993 → Mar 1995
  3. 3Samson Hydrocarbons CompanyApr 1995 → Jul 1996
  4. 4Samson Lone Star LPAug 1996 → Feb 2007
  5. 5Samson Lone Star, LLCOct 2007 → Aug 2015
  6. 6Tecolote Energy Operating, LLCMar 2017 → Dec 2019
  7. 7Blackbeard Operating, LLCJan 2020 → Sep 2023
  8. 8Mmgl Txph, LLCOct 2023 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
643228-99RecompletionSamson Lone Star, LLCJul 25, 2007Sep 4, 2007Oct 18, 200712,225

Completions

CompletedLeaseFieldOperatorStatusDepth
Oct 28, 2007Campbell G-14-232885Mendota NW. (Granite Wash)Mmgl Txph LLCProducing12,225
Jun 21, 1974Campbell J. W. G-14-59608Mendota S. E. (Morrow Upper)Samson Lone Star LLCNot on Schedule—

Perforations

Perforated and open-hole intervals.

FromToType
10,36211,460Perforated
12,04012,070Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6252,806—1,550 S
5.512,225—450 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Feb 26, 2008Dec 3, 2007Yes
00Feb 8, 2008——
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/21130304, documented in the API reference.