TEXAS · WELLS · HEMPHILL COUNTY · API 42-211-30603 · DISTRICT 08
Isaacs -209- #1209
Hemphill County · Canadian SW. (Granite Wash) field · Temp Abandoned · Vertical
Isaacs -209- #1209 (API 42-211-30603) is a well in Hemphill County operated by Mountainside Energy Operating L, completed August 5, 1993 and listed as temp abandoned on the RRC schedule, shut in April 1, 2020.
The RRC has issued one drilling permit, issued June 25, 1993, permitted to 13,550 ft.
It was permitted by Chevron U. S. A. Inc. and has since transferred to Mountainside Energy Operating L on the wellbore schedule.
Completion filings report 5 formation tops, including Douglas, Granite Wash, U. Morrow, Morrow.
No lease production has been reported under this well’s leases.
Operator of record
Mountainside Energy Operating L
Permitted by Chevron U. S. A. Inc.; the EWA schedule now lists a different operator.
- Based in
- Dallas, TX
- P-5 status
- Active (A)
- P-5 last filed
- Jan 21, 2026
- Phone
- (855) 906-6868
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Mountainside Energy Operating L |
| Production reports | Pantera Energy Companythrough Mar 2020 |
| Latest permit | Chevron U. S. A. Inc.Jun 25, 1993 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 13,550
- total depth, ft
- 1
- permits on file
- Jun 25, 1993
- last permit issued
- Aug 5, 1993
- completed
- 0
- cumulative oil, bbl
- 609K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Aug 5, 1993
- Shut in
- Apr 1, 2020
- Plugged
- —
Operator's P-5 on the schedule: Active (A)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Isaacs -209- G-14-146370 | Canadian, SW. (Granite Wash) | Mountainside Energy Operating, L | 1 | 0 | 609K | Jul 1993 – Jul 2026 |
| Isaacs G-14-119374 | Red Deer Creek (Morrow, Upper) | Chevron U. S. A. Inc. | 1 | 0 | 0 | Jan 1993 – Mar 1995 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Chevron U. S. A. Inc.Aug 1993 → Nov 2016
- 2Pantera Energy CompanyDec 2016 → Mar 2020
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 413112-99 | Recompletion | Chevron U. S. A. Inc. | Jun 23, 1993 | Jun 25, 1993 | Jul 23, 1993 | 13,550 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Aug 5, 1993 | Isaacs -209- G-14-146370 | Canadian SW. (Granite Wash) | Mountainside Energy Operating L | Temp Abandoned · shut in Apr 1, 2020 | 13,550 |
| Oct 9, 1976 | Isaacs O-14-4151 | Red Deer Creek (Morrow Upper) | Chevron U. S. A. Inc. | Not on Schedule | — |
| Oct 9, 1976 | Isaacs G-14-119374 | Red Deer Creek (Morrow Upper) | Chevron U. S. A. Inc. | Not on Schedule | — |
| Oct 5, 1976 | Isaacs O-14-4152 | Mendota NW. (Douglas Lo.) | Gulf Oil Corp. | Not on Schedule | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,478 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Douglas | 7,164 | -4,686 |
| DouglasDOUGLAS SD. | 7,164 | -4,686 |
| Granite Wash | 9,562 | -7,084 |
| Granite WashGRANITE WASH SD. | 9,562 | -7,084 |
| U. Morrow | 11,314 | -8,836 |
| MorrowUPPER MORROW SD. | 11,314 | -8,836 |
| L. Morrow | 12,960 | -10,482 |
| MorrowLOWER MORROW SD. | 12,960 | -10,482 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 10,005 | 10,046 | Perforated |
| 11,318 | 11,356 | Perforated |
| — | 7,206 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 3,366 | 12.25 | 2,800 S |
| 9.625 | 3,366 | — | 2,800 S |
| 7 | 11,099 | 8.5 | 500 S |
| 7 | 11,099 | — | 500 S |
| 5 | 12,960 | — | 285 S |
| 3.5 | 13,545 | — | 140 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Sep 27, 1993 | Aug 30, 1993 | Yes |
| 00 | Sep 9, 1993 | — | — |
| 00 | Feb 18, 1986 | Dec 13, 1985 | — |
| 00 | Jan 8, 1986 | — | — |
| 00 | Jan 12, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-211-30603 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-211-30603 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/21130603, documented in the API reference.