TEXAS · WELLS · HEMPHILL COUNTY · API 42-211-30868 · DISTRICT 08
Brown J. T. -et- -al- -B- #11
Hemphill County · Hemphill (Granite Wash.) field · Shut In-Multi-Compl · Vertical
Brown J. T. -ET- -AL- -B- #11 (API 42-211-30868) is a well in Hemphill County operated by Mmgl Txph LLC, completed May 22, 1978 and listed as shut in-multi-compl on the RRC schedule, shut in April 1, 2018.
The RRC has issued 2 drilling permits between 1977 and 1978, permitted to 12,100 ft.
It was permitted by Diamond Chemicals Company and has since transferred to Mmgl Txph LLC on the wellbore schedule.
Its 2 leases have reported 5.33K barrels of oil and 1.03M mcf of gas since January 1993, with no volume in the three years through April 2026. The leases carry 2 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Diamond Chemicals Company; the EWA schedule now lists a different operator.
- Based in
- Dallas, TX
- P-5 status
- Active (A)
- P-5 last filed
- Jul 24, 2025
- Permits on file
- 10
- Phone
- (972) 701-8377
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Mmgl Txph LLC |
| Production reports | Mmgl Txph, LLCthrough Sep 2018 |
| Latest permit | Diamond Chemicals CompanyJun 27, 1978 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 12,100
- total depth, ft
- 2
- permits on file
- Jun 27, 1978
- last permit issued
- May 22, 1978
- completed
- 5.33K
- cumulative oil, bbl
- 1.03M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Sep 2018
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- May 22, 1978
- Shut in
- Apr 1, 2018
- Plugged
- —
Operator's P-5 on the schedule: Active – Extension (X)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Brown, J. T. -et- -al- -B- G-14-76875 | Canadian, SE (Douglas) | Mmgl Txph, LLC | 1 | 5.25K | 1M | Jan 1993 – Sep 2018 |
| Brown, J. T. -et- -al- -B- G-14-77921 | Hemphill (Granite Wash.) | Mmgl Txph, LLC | 1 | 78 | 22.1K | Jan 1993 – Dec 2000 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Maxus Exploration CompanyJan 1993 → Jan 1995
- 2Midgard Energy CompanyFeb 1995 → Sep 1997
- 3Crescendo Resources, L.P.Oct 1997 → Mar 2000
- 4Amoco Production CompanyApr 2000 → Dec 2001
- 5BP America Production CompanyJan 2002 → Sep 2018
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 28062-99 | Drill | Diamond Chemicals Company | Jun 27, 1978 | Jun 27, 1978 | — | 12,100 |
| 1262-99 | Drill | Diamond Chemicals Company | Jun 21, 1977 | Jun 21, 1977 | Jan 1, 1978 | 11,950 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| May 22, 1978 | Brown J. T. -et- -al- -B- G-14-77921 | Hemphill (Granite Wash.) | Mmgl Txph LLC | Shut In-Multi-Compl · shut in Dec 1, 2000 | 12,100 |
| May 22, 1978 | Brown J. T. -et- -al- -B- G-14-76875 | Canadian SE (Douglas) | Mmgl Txph LLC | Temp Abandoned · shut in Apr 1, 2018 | 12,100 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 7,258 | 7,385 | Perforated |
| 10,320 | 10,352 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 2,683 | — | 1,275 S |
| 7 | 11,680 | — | 500 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 12, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-211-30868 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-211-30868 → scanned completion filings
Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/21130868, documented in the API reference.