WELL · 42-211-30899 · DISTRICT 10

Isaacs 209 #2209

N

Hemphill County  · Vertical

Isaacs 209 #2209 (API 42-211-30899) is a permitted well in Hemphill County filed by Chevron U. S. A. Inc.; no completion report is on file yet.

The RRC has issued 3 drilling permits between 1977 and 2009, permitted to 11,600 ft.

Completion filings report 6 formation tops, including Brown Dolomite, Douglas, Lo. Douglas Sd, Lo. Douglas Sd..

Its 2 leases have reported 26.2K barrels of oil and 684K mcf of gas since January 1993, last reporting in July 2026. The leases carry 4 wells, so these are lease totals, not this well alone.

Operator of record

Chevron U. S. A. Inc.

Based in
Midland, TX
P-5 status
Active (A)
P-5 last filed
Jan 30, 2026
Permits on file
9,293
Phone
(866) 212-1212

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsPantera Energy Companythrough Mar 2020
Latest permitChevron U. S. A. Inc.Oct 6, 2009
11,600
total depth, ft
3
permits on file
Oct 6, 2009
last permit issued
—
completed
26.2K
cumulative oil, bbl
684K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 4 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Isaacs G-14-251462Canadian, SW. (Granite Wash)Mountainside Energy Operating, L10185KJan 2008 – Jul 2026
Isaacs -209- O-14-5527Canadian SW. (Douglas,lower)Chevron U. S. A. Inc.326.2K499KJan 1993 – Oct 2010

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Chevron U. S. A. Inc.Jan 1993 → Nov 2016
  2. 2Pantera Energy CompanyDec 2016 → Mar 2020

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
683617-99RecompletionChevron U. S. A. Inc.Jul 29, 2009Oct 6, 2009Dec 3, 200711,507
345281-99RecompletionChevron U. S. A. Inc.Apr 18, 1988Apr 22, 1988—11,507
6285-99DrillGulf Oil Corp.Aug 25, 1977Aug 25, 1977Aug 30, 197711,600

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-14-251462————
—— O-14-5527————

Formation tops

As filed on W-2/G-1. Subsea from 2,522 ft elevation.Download CSV →

FormationMD ftSubsea
Brown Dolomite3,862-1,340
DouglasDOUGLAS X6,910-4,388
Lo. Douglas SD7,220-4,698
Lo. Douglas Sd.7,220-4,698
DouglasLOWER DOUGLAS7,220-4,698
Granite WashGRANITE WASH SD9,648-7,126
Granite WashGRANITE WASH SD.9,648-7,126
MorrowMORROW SHALE11,154-8,632
Morrow11,366-8,844
MorrowMORROW PERFS11,366-8,844
MorrowUPPER MORROW SD11,366-8,844
MorrowUPPER MORROW SD.11,366-8,844

Perforations

Perforated and open-hole intervals.

FromToType
7,2307,245Perforated
10,07810,088Perforated
10,08810,108Perforated
11,36611,410Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6253,48112.251,960 S
8.6253,48212.252,210 S
8.6253,482—2,210 S
5.511,1247.875450 S
5.511,124——
3.511,5074.75125 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Dec 2, 2009May 20, 2008Yes
00Oct 7, 2009——
00Jun 23, 1993May 6, 1993—
00Jan 9, 1989Sep 1, 1988—
00Dec 16, 1988——
00Feb 28, 1986Dec 13, 1985—
00Jan 8, 1986——
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/21130899, documented in the API reference.