TEXAS · WELLS · HEMPHILL COUNTY · API 42-211-31141 · DISTRICT 08

Bowers -G- #2

Shut in

Hemphill County · Washita Creek (Morrow 15225) field · Temp Abandoned  · Vertical

Bowers -G- #2 (API 42-211-31141) is a well in Hemphill County operated by Kaiser-Francis Oil Company, completed April 9, 2011 and listed as temp abandoned on the RRC schedule, shut in April 1, 2014.

The RRC has issued 2 drilling permits between 1979 and 2004, permitted to 20,210 ft.

Completion filings report 6 formation tops, including Allison Sd, Bowers Sd, Briscol, Palo Duro.

No lease production has been reported under this well’s leases.

Operator of record

Kaiser-Francis Oil Company

Based in
Tulsa, OK
P-5 status
Active – Extension (X)
P-5 last filed
Apr 15, 2026
Permits on file
464
Phone
(918) 494-0000

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleKaiser-Francis Oil Company
Production reportsPhillips Petroleum Companythrough Sep 1996
Latest permitKaiser-Francis Oil CompanyJun 18, 2004

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

20,210
total depth, ft
2
permits on file
Jun 18, 2004
last permit issued
Apr 9, 2011
completed
0
cumulative oil, bbl
2.04M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Apr 9, 2011
Shut in
Apr 1, 2014
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Bowers -G- G-14-279577Washita Creek (Morrow 15225)Kaiser-Francis Oil Company100Mar 2014 – Jul 2026
Bowers -G- G-14-90781Washita Creek (Hunton 19475)Kaiser-Francis Oil Company102.04MJan 1993 – Feb 2014

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Phillips Petroleum CompanyJan 1993 → Sep 1996

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
547142-99RecompletionKaiser-Francis Oil CompanyJun 18, 2004Jun 18, 2004Dec 28, 200420,210
55774-99DrillPhillips Petroleum CompanyAug 16, 1979Aug 16, 1979Oct 7, 197920,300

Completions

CompletedLeaseFieldOperatorStatusDepth
Apr 9, 2011Bowers -G- G-14-279577Washita Creek (Morrow 15225)Kaiser-Francis Oil CompanyTemp Abandoned · shut in Apr 1, 201420,210
Oct 18, 1980Bowers -G- G-14-90781Washita Creek (Hunton 19475)Kaiser-Francis Oil CompanyNot on Schedule—

Formation tops

As filed on W-2/G-1. Subsea from 2,457 ft elevation.Download CSV →

FormationMD ftSubsea
Allison SD15,318-12,861
Bowers SD15,474-13,017
Briscol15,654-13,197
Palo Duro15,766-13,309
Tascosa15,853-13,396
MississippianMISS. CHESTER16,054-13,597

Perforations

Perforated and open-hole intervals.

FromToType
19,60320,042Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.3753,57717.53,100 S
9.62513,676—1,400 S
9.62513,67712.251,400 S
5.516,1777.875400 S
5.516,177—470 S
2.87519,514——

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Apr 5, 2016Mar 3, 2016—
00Jan 12, 1984Nov 19, 1980—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/21131141, documented in the API reference.