TEXAS · WELLS · HEMPHILL COUNTY · API 42-211-31146 · DISTRICT 08
Campbell 38 #2
Hemphill County · Mendota NW. (Granite Wash) field · Temp Abandoned · Vertical
Campbell 38 #2 (API 42-211-31146) is a well in Hemphill County operated by Mmgl Txph LLC, completed June 18, 1980 and listed as temp abandoned on the RRC schedule, shut in May 1, 2015.
The RRC has issued one drilling permit, issued August 22, 1979, permitted to 11,048 ft.
It was permitted by Exxon Corp. and has since transferred to Mmgl Txph LLC on the wellbore schedule.
Completion filings report 2 formation tops, including Douglas, Granite Wash.
Its 3 leases have reported 298 barrels of oil and 29.9K mcf of gas since January 1993, last reporting in July 2026. The leases carry 3 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Exxon Corp.; the EWA schedule now lists a different operator.
- Based in
- Dallas, TX
- P-5 status
- Active (A)
- P-5 last filed
- Jul 24, 2025
- Permits on file
- 10
- Phone
- (972) 701-8377
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Samson Lone Star LLC |
| Production reports | Samson Lone Star, LLCthrough May 2015 |
| Latest permit | Exxon Corp.Aug 22, 1979 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 11,048
- total depth, ft
- 1
- permits on file
- Aug 22, 1979
- last permit issued
- Jun 18, 1980
- completed
- 298
- cumulative oil, bbl
- 29.9K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Jun 18, 1980
- Shut in
- May 1, 2015
- Plugged
- —
Operator's P-5 on the schedule: Active – Extension (X)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Campbell 38 G-14-263208 | Mendota, NW. (Granite Wash) | Mmgl Txph, LLC | 1 | 0 | 9.98K | Aug 2011 – Jul 2026 |
| Campbell 38 O-14-7325 | Mendota, NW. (Granite Wash) | Samson Lone Star, LLC | 1 | 298 | 4.56K | Jun 1999 – Apr 2014 |
| Campbell Santa FE Unit G-14-89623 | Mendota, NW. (Granite Wash) | Gruy Petroleum Management Co. | 1 | 0 | 15.4K | Jan 1993 – May 2002 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Exxon Corp.Jan 1993 → Jul 1993
- 2Wallace Oil & Gas, Inc.Aug 1993 → Sep 1995
- 3Parker & Parsley Development L.POct 1995 → Aug 1997
- 4Pioneer Natural Res. USA, Inc.Sep 1997 → Jun 1999
- 5Prize Operating CompanyJul 1999 → Mar 2002
- 6Gruy Petroleum Management Co.Apr 2002 → Jan 2006
- 7Samson Lone Star, LLCJun 2010 → May 2015
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 56202-99 | Drill | Exxon Corp. | Aug 22, 1979 | Aug 22, 1979 | Mar 7, 1980 | 11,200 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Jun 18, 1980 | Campbell 38 G-14-263208 | Mendota NW. (Granite Wash) | Mmgl Txph LLC | Temp Abandoned · shut in May 1, 2015 | 11,048 |
| Jul 18, 1980 | Campbell Santa FE Unit G-14-89623 | Mendota NW. (Granite Wash) | Gruy Petroleum Management Co. | Not on Schedule | — |
| — | Campbell 38 O-14-7325 | Mendota NW. (Granite Wash) | Samson Lone Star LLC | Not on Schedule | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,569 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Douglas | — | — |
| Granite Wash | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 10,440 | 10,918 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 3,230 | 12.25 | 3,105 S |
| 2.375 | 10,396 | — | — |
| 4.5 | 11,050 | 7.875 | 785 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Apr 30, 2012 | Aug 26, 2011 | — |
| 00 | Sep 13, 1999 | — | — |
| 00 | Jan 12, 1984 | Sep 15, 1980 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-211-31146 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-211-31146 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/21131146, documented in the API reference.