TEXAS · WELLS · HEMPHILL COUNTY · FEE LEASE · API 42-211-31204 · DISTRICT 08

Fee #321

Shut in

Hemphill County · Glazier NW. (Morrow Upper) field · Temp Abandoned  · Vertical

Fee #321 (API 42-211-31204) is a well in Hemphill County operated by Mmgl Txph LLC, completed May 18, 2010 and listed as temp abandoned on the RRC schedule, shut in April 1, 2022.

The RRC has issued one drilling permit, issued February 28, 1980, permitted to 11,037 ft.

It was permitted by Shell Oil Company and has since transferred to Mmgl Txph LLC on the wellbore schedule.

Completion filings report 4 formation tops, including Tonkawa, Kansas, Cherokee, Morrow.

No lease production has been reported under this well’s leases.

Operator of record

Mmgl Txph LLC

Permitted by Shell Oil Company; the EWA schedule now lists a different operator.

Based in
Dallas, TX
P-5 status
Active (A)
P-5 last filed
Jul 24, 2025
Permits on file
10
Phone
(972) 701-8377

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleShell Western E&P Inc.
Production reportsMmgl Txph, LLCthrough Oct 2023
Latest permitShell Oil CompanyFeb 28, 1980

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

11,037
total depth, ft
1
permits on file
Feb 28, 1980
last permit issued
May 18, 2010
completed
0
cumulative oil, bbl
1.26M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
May 18, 2010
Shut in
Apr 1, 2022
Plugged
—

Operator's P-5 on the schedule: Active – Extension (X)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Fee G-14-113216Glazier, NW. (Morrow Upper)Mmgl Txph, LLC101.26MJan 1993 – Jul 2026

Gas, mcf lease total

Last 12 months 0 · prior 12 0

051015202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Cross Timbers Operating CompanyJan 1993 → Feb 1998
  2. 2Amoco Production CompanyMar 1998 → Dec 2001
  3. 3Crescendo Resources, L.P.Dec 1998 → Nov 1999
  4. 4BP America Production CompanyJan 2002 → Feb 2020
  5. 5Blackbeard Operating, LLCMar 2020 → Mar 2022
  6. 6Mmgl Txph, LLCOct 2023 → Oct 2023

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
73755-99DrillShell Oil CompanyFeb 28, 1980Feb 28, 1980—11,050

Completions

CompletedLeaseFieldOperatorStatusDepth
May 18, 2010Fee G-14-113216Glazier NW. (Morrow Upper)Mmgl Txph LLCTemp Abandoned · shut in Apr 1, 202211,037
Jun 13, 1980Fee O-14-4502Glazier NW. (Morrow Upper)Shell Western E&P Inc.Not on Schedule—

Formation tops

As filed on W-2/G-1. Subsea from 2,671 ft elevation.Download CSV →

FormationMD ftSubsea
Tonkawa7,440-4,769
Kansas8,120-5,449
Cherokee9,385-6,714
Morrow10,879-8,208

Perforations

Perforated and open-hole intervals.

FromToType
10,87910,906Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,71112.251,000 S
710,7008.75500 S
710,7398.75500 S
2.37510,792——

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 9, 2010May 26, 2010—
00Dec 14, 1984Oct 19, 1984—
00Dec 1, 1984Sep 11, 1984—
00Jan 12, 1984Oct 27, 1980—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/21131204, documented in the API reference.