TEXAS · WELLS · HEMPHILL COUNTY · API 42-211-31228 · DISTRICT 08
Begert -7- #1
Hemphill County · Allison Parks (Cleveland) field · Vertical
Begert -7- #1 (API 42-211-31228) is a plugged well in Hemphill County, plugged January 29, 1987, last operated by Kerr-Mcgee Corporation.
The RRC has issued 3 drilling permits between 1980 and 1984, permitted to 16,000 ft.
Completion filings report 6 formation tops, including Blaine, Cimarron, Panhandle Lime, Cleveland.
Operator of record
- Based in
- Dallas, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- Apr 8, 1999
- Permits on file
- 626
- Phone
- (972) 715-4828
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Kerr-McGee Corporation |
| Production reports | none |
| Latest permit | Kerr-McGee CorporationMay 1, 1984 |
- 16,000
- total depth, ft
- 3
- permits on file
- May 1, 1984
- last permit issued
- Aug 1, 1984
- completed
- —
- cumulative oil, bbl
- —
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Aug 1, 1984
- Shut in
- —
- Plugged
- Jan 29, 1987
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 237592-99 | Recompletion | Kerr-McGee Corporation | Apr 27, 1984 | May 1, 1984 | — | 11,065 |
| 178463-99 | Recompletion | Kerr-McGee Corporation | Nov 17, 1982 | Nov 17, 1982 | — | 15,310 |
| 81517-99 | Drill | Kerr-McGee Corporation | May 19, 1980 | May 19, 1980 | — | 16,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Aug 1, 1984 | Begert -7- O-14-6210 | Allison Parks (Cleveland) | Kerr-McGee Corporation | Plugged | — |
| Aug 1, 1984 | Begert -7- G-14-114203 | Allison Parks (Cleveland) | Kerr-McGee Corporation | Plugged | — |
| Nov 12, 1982 | Begert -7- G-14-103733 | Allison Parks (Granite Wash) | Kerr-McGee Corporation | Plugged | — |
| Feb 1, 1981 | Begert 7 G-14-93468 | Allison Parks (Morrow Up.) | Kerr-McGee Corporation | Plugged | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,600 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Blaine | 1,000 | 1,600 |
| Cimarron | 2,350 | 250 |
| Panhandle Lime | 3,690 | -1,090 |
| Cleveland | 10,970 | -8,370 |
| Granite Wash | 12,300 | -9,700 |
| MorrowMORROW UPPER | 15,172 | -12,572 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 10,970 | 11,048 | Perforated |
| 13,569 | 13,853 | Perforated |
| 15,177 | 15,193 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 30 | 94 | 40 | 575 S |
| 16 | 636 | 12.25 | 1,150 S |
| 16 | 636 | 20 | 1,150 S |
| 10.75 | 5,918 | 14.75 | 1,900 S |
| 3.5 | 14,524 | — | — |
| 7 | 14,851 | 8.75 | 900 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 13, 1986 | Nov 1, 1985 | — |
| 00 | Nov 28, 1985 | — | — |
| 00 | Feb 14, 1985 | Dec 12, 1984 | — |
| 00 | Jan 11, 1985 | Nov 29, 1984 | — |
| 00 | Jan 12, 1984 | Dec 21, 1982 | — |
| 00 | Jan 12, 1984 | May 27, 1981 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-211-31228 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-211-31228 → scanned completion filings
Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/21131228, documented in the API reference.