TEXAS · WELLS · HEMPHILL COUNTY · API 42-211-31675 · DISTRICT 08

Haygood - Amoco Unit #107

N

Hemphill County · Buffalo Wallow (Oswego Upper) field  · Vertical

Haygood - Amoco Unit #107 (API 42-211-31675) is a well in Hemphill County operated by Amoco Production Company, completed June 20, 1984.

The RRC has issued one drilling permit, issued March 15, 1984, permitted to 14,800 ft.

No lease production has been reported under this well’s leases.

Operator of record

Amoco Production Company

Based in
Houston, TX
P-5 status
Inactive (I)
P-5 last filed
Jun 29, 2015
Permits on file
7,201
Phone
(281) 366-7061

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleAmoco Production Company
Production reportsnone
Latest permitAmoco Production CompanyMar 15, 1984
14,800
total depth, ft
1
permits on file
Mar 15, 1984
last permit issued
Jun 20, 1984
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jun 20, 1984
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
233180-99DrillAmoco Production CompanyMar 15, 1984Mar 15, 1984Apr 10, 198414,800

Completions

CompletedLeaseFieldOperatorStatusDepth
Jun 20, 1984Haygood - Amoco Unit O-14-6727Buffalo Wallow (Oswego Upper)Amoco Production CompanyNot on Schedule—

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 29, 1990——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/21131675, documented in the API reference.