TEXAS · WELLS · HEMPHILL COUNTY · PALMER-ALLISON LEASE · API 42-211-31719 · DISTRICT 08
Palmer-Allison #107
Hemphill County · Allison Parks (Morrow Up.) field · Vertical
Palmer-Allison #107 (API 42-211-31719) is a plugged well in Hemphill County, plugged June 3, 2013, last operated by Kaiser-Francis Oil Company.
The RRC has issued one drilling permit, issued September 6, 1984, permitted to 15,600 ft.
Completion filings report 6 formation tops, including Douglas, Tonkawa, Avant, Hepler Marker.
Operator of record
- Based in
- Tulsa, OK
- P-5 status
- Active – Extension (X)
- P-5 last filed
- Apr 15, 2026
- Permits on file
- 464
- Phone
- (918) 494-0000
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Kaiser-Francis Oil Company |
| Production reports | Kaiser-Francis Oil Companythrough Apr 2006 |
| Latest permit | Kaiser-Francis Oil CompanySep 6, 1984 |
- 15,600
- total depth, ft
- 1
- permits on file
- Sep 6, 1984
- last permit issued
- Dec 11, 1984
- completed
- 0
- cumulative oil, bbl
- 926K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Nov 2013
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Dec 11, 1984
- Shut in
- —
- Plugged
- Jun 3, 2013
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Palmer-Allison G-14-114847 | Allison Parks (Morrow, Up.) | — | 1 | 0 | 926K | Jan 1993 – Nov 2013 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Kaiser-Francis Oil CompanyJan 1993 → Apr 2006
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 250633-99 | Drill | Kaiser-Francis Oil Company | Sep 6, 1984 | Sep 6, 1984 | Oct 2, 1984 | 15,600 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Dec 11, 1984 | Palmer-Allison G-14-114847 | Allison Parks (Morrow Up.) | Kaiser-Francis Oil Company | Plugged | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,505 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Douglas | 8,164 | -5,659 |
| Tonkawa | 8,960 | -6,455 |
| Avant | 9,513 | -7,008 |
| Hepler Marker | 10,712 | -8,207 |
| Oswego | 11,184 | -8,679 |
| Granite WashGRANITE WASH B | 11,861 | -9,356 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 14,336 | 14,346 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 395 | 17.5 | 450 S |
| 8.625 | 3,165 | 12.25 | 2,800 S |
| 5.5 | 14,210 | 7.875 | 600 S |
| 2.875 | 14,466 | 4.625 | 150 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 12, 1985 | Jan 15, 1985 | — |
| 00 | Mar 2, 1985 | Dec 14, 1984 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-211-31719 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-211-31719 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/21131719, documented in the API reference.