TEXAS · WELLS · HEMPHILL COUNTY · BRAINARD, E. S. F. "G" LEASE · API 42-211-31805 · DISTRICT 08
Brainard E. S. F. G #3078
Hemphill County · Canadian (Topeka) field · Vertical
Brainard E. S. F. G #3078 (API 42-211-31805) is a plugged well in Hemphill County, plugged June 19, 1997, last operated by Midgard Energy Company.
The RRC has issued 2 drilling permits between 1985 and 1996, permitted to 13,300 ft.
Completion filings report 12 formation tops, including Bd, Doug, Kc, Cleve.
Operator of record
- Based in
- The Woodlands, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- Oct 28, 2003
- Permits on file
- 357
- Phone
- (281) 681-7206
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | none |
| Latest permit | Midgard Energy CompanyAug 26, 1996 |
- 13,300
- total depth, ft
- 2
- permits on file
- Aug 26, 1996
- last permit issued
- Apr 2, 1997
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Apr 1997 THROUGH Sep 1997
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Apr 2, 1997
- Shut in
- —
- Plugged
- Jun 19, 1997
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Brainard, E. S. F. "G" O-14-7203 | Canadian (Topeka) | Midgard Energy Company | 1 | 0 | 0 | Apr 1997 – Sep 1997 |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 451685-99 | Reenter | Midgard Energy Company | Aug 19, 1996 | Aug 26, 1996 | Oct 21, 1996 | 6,400 |
| 291372-99 | Drill | Diamond Shamrock Exploration Co. | Feb 21, 1985 | Apr 22, 1985 | — | 13,300 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Apr 2, 1997 | Brainard E. S. F. G O-14-7203 | Canadian (Topeka) | Midgard Energy Company | Plugged | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,407 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| BD | 3,602 | -1,195 |
| Doug | 6,635 | -4,228 |
| KC | 7,947 | -5,540 |
| Cleve | 8,548 | -6,141 |
| Cleve Pay | 8,613 | -6,206 |
| DM | 8,990 | -6,583 |
| Chero | 9,585 | -7,178 |
| Atoka | 10,692 | -8,285 |
| 13 FL | 10,722 | -8,315 |
| AtokaATOKA PAY | 10,795 | -8,388 |
| NW | 10,928 | -8,521 |
| Squaw Belly | 11,913 | -9,506 |
| MississippianMISS | 12,996 | -10,589 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 5,770 | 5,828 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 2,292 | 12.25 | 810 S |
| 4.5 | 6,203 | 8.75 | 690 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jul 9, 1997 | Apr 22, 1997 | Yes |
| 00 | Jul 3, 1997 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-211-31805 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-211-31805 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/21131805, documented in the API reference.