TEXAS · WELLS · HEMPHILL COUNTY · API 42-211-31820 · DISTRICT 08

Young-Allison #2B

Plugged

Hemphill County · Allison Parks (Morrow Up.) field  · Vertical

Young-Allison #2B (API 42-211-31820) is a plugged well in Hemphill County, plugged June 29, 1989, last operated by Kaiser-Francis Oil Company.

The RRC has issued one drilling permit, issued January 23, 1986, permitted to 15,200 ft.

Completion filings report 2 formation tops, including 13 Finger, Morrow.

Operator of record

Kaiser-Francis Oil Company

Based in
Tulsa, OK
P-5 status
Active – Extension (X)
P-5 last filed
Apr 15, 2026
Permits on file
464
Phone
(918) 494-0000

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleKaiser-Francis Oil Company
Production reportsnone
Latest permitKaiser-Francis Oil CompanyJan 23, 1986
15,200
total depth, ft
1
permits on file
Jan 23, 1986
last permit issued
Apr 25, 1986
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Apr 25, 1986
Shut in
—
Plugged
Jun 29, 1989

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
296064-99DrillKaiser-Francis Oil CompanyJan 23, 1986Jan 23, 1986Mar 6, 198615,200

Completions

CompletedLeaseFieldOperatorStatusDepth
Apr 25, 1986Young-Allison G-14-123898Allison Parks (Morrow Up.)Kaiser-Francis Oil CompanyPlugged—

Formation tops

As filed on W-2/G-1. Subsea from 2,520 ft elevation.Download CSV →

FormationMD ftSubsea
13 Finger13,791-11,271
Morrow13,993-11,473

Perforations

Perforated and open-hole intervals.

FromToType
13,81514,275Open hole

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.7541617.5550 S
8.3753,14012.252,350 S
5.513,8157.875600 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00May 5, 1987Mar 25, 1987—
00May 1, 1987——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/21131820, documented in the API reference.