TEXAS · WELLS · HEMPHILL COUNTY · BUTCHER LEASE · API 42-211-31849 · DISTRICT 08

Butcher #105

Y

Hemphill County · Allison Parks (Morrow Up.) field · Producing  · Vertical

Butcher #105 (API 42-211-31849) is a well in Hemphill County operated by Mmgl Txph LLC, completed April 23, 1987 and listed as producing on the RRC schedule.

The RRC has issued 2 drilling permits (amended once) between 1985 and 1986, permitted to 15,159 ft.

It was permitted by Kerr-Mcgee Corporation and has since transferred to Mmgl Txph LLC on the wellbore schedule.

Completion filings report 4 formation tops, including Oswego, Granite Wash, 13 Finger Lime, Morrow.

No lease production has been reported under this well’s leases.

Operator of record

Mmgl Txph LLC

Permitted by Kerr-McGee Corporation; the EWA schedule now lists a different operator.

Based in
Dallas, TX
P-5 status
Active (A)
P-5 last filed
Jul 24, 2025
Permits on file
10
Phone
(972) 701-8377

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleMmgl Txph LLC
Production reportsMmgl Txph, LLCthrough Apr 2026
Latest permitKerr-McGee CorporationNov 4, 1986

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

15,159
total depth, ft
3
permits on file
Nov 4, 1986
last permit issued
Apr 23, 1987
completed
0
cumulative oil, bbl
1.94M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Apr 23, 1987
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active – Extension (X)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Butcher G-14-124601Allison Parks (Morrow, Up.)Mmgl Txph, LLC101.94MJan 1993 – Jul 2026

Gas, mcf lease total

Last 12 months 34,636 · prior 12 35,772(-3%)

02K4K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Kerr-McGee CorporationJan 1993 → Dec 1996
  2. 2Devon Energy Corporation(nevada)Jan 1997 → Mar 2000
  3. 3Devon Energy Production Co, L.P.Apr 2000 → Jun 2016
  4. 4Tecolote Energy Operating, LLCJul 2016 → Dec 2019
  5. 5Blackbeard Operating, LLCJan 2020 → Sep 2023
  6. 6Mmgl Txph, LLCOct 2023 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
322647-98DrillKerr-McGee CorporationFeb 2, 1987Nov 4, 1986—15,500
322647-99DrillKerr-McGee CorporationNov 3, 1986Nov 4, 1986—15,500
283033-99DrillKerr-McGee CorporationAug 21, 1985Aug 21, 1985—15,500

Completions

CompletedLeaseFieldOperatorStatusDepth
Apr 23, 1987Butcher G-14-124601Allison Parks (Morrow Up.)Mmgl Txph LLCProducing15,159

Formation tops

As filed on W-2/G-1. Subsea from 2,544 ft elevation.Download CSV →

FormationMD ftSubsea
Oswego11,605-9,061
Granite Wash11,735-9,191
Granite WashGRANITE WASH A12,124-9,580
Granite WashGRANITE WASH B12,354-9,810
13 Finger Lime14,597-12,053
Morrow14,708-12,164

Perforations

Perforated and open-hole intervals.

FromToType
15,00315,017Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.37545117.5450 S
9.6253,13112.251,300 S
714,7388.5900 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Oct 1, 1987Aug 10, 1987—
00Jul 29, 1987Jul 9, 1987Yes
00Jul 28, 1987——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/21131849, documented in the API reference.