TEXAS · WELLS · HEMPHILL COUNTY · MEEK -A- LEASE · API 42-211-31916 · DISTRICT 08
Meek -A- #1026
Hemphill County · Hemphill (Granite Wash.) field · Vertical
Meek -A- #1026 (API 42-211-31916) is a plugged well in Hemphill County, plugged October 27, 2000, last operated by Anadarko Petroleum Corporation.
The RRC has issued one drilling permit, issued August 7, 1989, permitted to 10,650 ft.
Completion filings report 4 formation tops, including Brown Dolomite, Base Heebner, Kansas City, Granite Wash.
Operator of record
Anadarko Petroleum Corporation
- Based in
- Houston, TX
- P-5 status
- Delinquent (D)
- P-5 last filed
- Jun 11, 2012
- Permits on file
- 4,004
- Phone
- (832) 636-3130
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Anadarko Petroleum Corporation |
| Production reports | Anadarko Petroleum Corporationthrough Mar 1996 |
| Latest permit | Anadarko Petroleum Corp.Aug 7, 1989 |
- 10,650
- total depth, ft
- 1
- permits on file
- Aug 7, 1989
- last permit issued
- Oct 11, 1989
- completed
- 0
- cumulative oil, bbl
- 14.2K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Oct 2000
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Oct 11, 1989
- Shut in
- —
- Plugged
- Oct 27, 2000
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Meek -A- G-14-132389 | Hemphill (Granite Wash.) | Anadarko Petroleum Corporation | 1 | 0 | 14.2K | Jan 1993 – Oct 2000 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Anadarko Petroleum CorporationJan 1993 → Mar 1996
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 362348-99 | Drill | Anadarko Petroleum Corp. | Aug 3, 1989 | Aug 7, 1989 | — | 10,650 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Oct 11, 1989 | Meek -A- G-14-132389 | Hemphill (Granite Wash.) | Anadarko Petroleum Corporation | Plugged | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,865 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Brown Dolomite | 4,616 | -1,751 |
| Base Heebner | 7,608 | -4,743 |
| Kansas City | 8,495 | -5,630 |
| Granite Wash | 9,365 | -6,500 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 9,842 | 9,858 | Perforated |
| 9,992 | 10,022 | Perforated |
| 10,230 | 10,414 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 20 | 40 | — | — |
| 8.625 | 2,800 | 12.25 | 2,020 S |
| 5.5 | 10,584 | 7.875 | 225 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Nov 1, 2000 | Sep 15, 2000 | — |
| 00 | Feb 22, 1990 | Jan 8, 1990 | Yes |
| 00 | Dec 18, 1989 | Nov 8, 1989 | Yes |
| 00 | Dec 12, 1989 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-211-31916 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-211-31916 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/21131916, documented in the API reference.