WELL · 42-211-32030 · DISTRICT 10

State #5156

Shut in

Hemphill County · Canadian SE (Douglas) field · Temp Abandoned  · Vertical

State #5156 (API 42-211-32030) is a well in Hemphill County operated by Mmgl Txph LLC, completed October 25, 1993 and listed as temp abandoned on the RRC schedule, shut in April 1, 2018.

The RRC has issued one drilling permit (amended once), issued July 26, 1993, permitted to 7,461 ft.

It was permitted by Umc Petroleum Corporation and has since transferred to Mmgl Txph LLC on the wellbore schedule.

Completion filings report 2 formation tops, including Brown Dolomite, Douglas.

No lease production has been reported under this well’s leases.

Operator of record

Mmgl Txph LLC

Permitted by Umc Petroleum Corporation; the EWA schedule now lists a different operator.

Based in
Dallas, TX
P-5 status
Active (A)
P-5 last filed
Jul 24, 2025
Permits on file
10
Phone
(972) 701-8377

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleMmgl Txph LLC
Production reportsTecolote Energy Operating, LLCthrough Mar 2018
Latest permitUmc Petroleum CorporationJul 26, 1993

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

7,461
total depth, ft
2
permits on file
Jul 26, 1993
last permit issued
Oct 25, 1993
completed
0
cumulative oil, bbl
914K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Aug 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Oct 25, 1993
Shut in
Apr 1, 2018
Plugged
—

Operator's P-5 on the schedule: Active – Extension (X)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
State G-14-147463Canadian, SE (Douglas)Mmgl Txph, LLC10914KAug 1993 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Umc Petroleum CorporationOct 1993 → Jul 1998
  2. 2Ocean Energy, Inc.Aug 1998 → Aug 2003
  3. 3Devon Louisiana CorporationSep 2003 → Dec 2005
  4. 4Devon Energy Production Co, L.P.Jan 2006 → Jun 2016
  5. 5Tecolote Energy Operating, LLCJul 2016 → Mar 2018

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
414114-98DrillUmc Petroleum CorporationAug 19, 1993Jul 26, 1993Aug 29, 19937,600
414114-99DrillUmc Petroleum CorporationJul 21, 1993Jul 26, 1993—7,600

Completions

CompletedLeaseFieldOperatorStatusDepth
Oct 25, 1993State G-14-147463Canadian SE (Douglas)Mmgl Txph LLCTemp Abandoned · shut in Apr 1, 20187,461

Formation tops

As filed on W-2/G-1. Subsea from 2,259 ft elevation.Download CSV →

FormationMD ftSubsea
Brown Dolomite3,722-1,463
DouglasUPPER DOUGLAS7,007-4,748
DouglasLOWER DOUGLAS7,195-4,936

Perforations

Perforated and open-hole intervals.

FromToType
7,0667,219Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,40812.25765 S
4.57,4547.875330 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Feb 7, 1994Nov 29, 1993Yes
00Dec 29, 1993——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/21132030, documented in the API reference.