TEXAS · WELLS · HEMPHILL COUNTY · MADISON 85 LEASE · API 42-211-32277 · DISTRICT 08
Madison 85 #1
Hemphill County · Nix-Todd (Morrow Lo.) field · Vertical
Madison 85 #1 (API 42-211-32277) is a plugged well in Hemphill County, plugged November 25, 2009, last operated by Brigham Oil & Gas L.P..
The RRC has issued one drilling permit (amended once), issued February 19, 1998, permitted to 15,300 ft.
Completion filings report 4 formation tops, including Tonkawa, Oswego, Morrow, Chester.
Its lease has reported 671K mcf of gas since June 1998, with no volume in the three years through April 2026.
Operator of record
- Based in
- Austin, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- Oct 19, 2012
- Permits on file
- 288
- Phone
- (512) 427-3300
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Brigham Oil & Gas L.P. |
| Production reports | Brigham Oil & Gas, L.P.through Apr 2005 |
| Latest permit | Brigham Oil & Gas, L.P.Feb 19, 1998 |
- 15,300
- total depth, ft
- 2
- permits on file
- Feb 19, 1998
- last permit issued
- Jun 1, 1998
- completed
- 0
- cumulative oil, bbl
- 671K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jun 1998 THROUGH Apr 2005
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jun 1, 1998
- Shut in
- —
- Plugged
- Nov 25, 2009
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Madison 85 G-14-170091 | Nix-Todd (Morrow, Lo.) | Brigham Oil & Gas, L.P. | 1 | 0 | 671K | Jun 1998 – Apr 2005 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Brigham Oil & Gas, L.P.Jun 1998 → Apr 2005
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 473567-98 | Drill | Brigham Oil & Gas, L.P. | Jul 16, 1998 | Feb 19, 1998 | Feb 28, 1998 | 15,300 |
| 473567-99 | Drill | Brigham Oil & Gas, L.P. | Feb 19, 1998 | Feb 19, 1998 | — | 15,300 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Jun 1, 1998 | Madison 85 G-14-170091 | Nix-Todd (Morrow Lo.) | Brigham Oil & Gas L.P. | Plugged | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,564 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 12,030 | 12,050 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 644 | 17.5 | 555 S |
| 9.625 | 6,796 | 12.25 | 830 S |
| 7 | 12,443 | 8.75 | 390 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Oct 12, 1998 | Jun 29, 1998 | Yes |
| 00 | Oct 5, 1998 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-211-32277 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-211-32277 → scanned completion filings
Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/21132277, documented in the API reference.