TEXAS · WELLS · HEMPHILL COUNTY · REMINGTON LEASE · API 42-211-32500 · DISTRICT 08

Remington #B 1

Shut in

Hemphill County · Parsell (Morrow Upper) field · Temp Abandoned  · Vertical

Remington #B 1 (API 42-211-32500) is a well in Hemphill County operated by BE Anadarko II LLC, completed October 23, 2001 and listed as temp abandoned on the RRC schedule, shut in February 1, 2023.

The RRC has issued one drilling permit, issued March 5, 2001, permitted to 12,101 ft.

It was permitted by Range Production Company and has since transferred to BE Anadarko II LLC on the wellbore schedule.

Completion filings report 3 formation tops, including Douglas, Tonkawa, Morrow.

Its lease has reported 2.48K barrels of oil and 279K mcf of gas since October 2001, with no volume in the three years through April 2026.

Operator of record

BE Anadarko II LLC

Permitted by Range Production Company; the EWA schedule now lists a different operator.

Based in
Austin, TX
P-5 status
Active (A)
P-5 last filed
Nov 19, 2025
Permits on file
2
Phone
(917) 204-3126

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleBE Anadarko II LLC
Production reportsBE Anadarko II, LLCthrough Dec 2024
Latest permitRange Production CompanyMar 5, 2001

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

12,101
total depth, ft
1
permits on file
Mar 5, 2001
last permit issued
Oct 23, 2001
completed
2.48K
cumulative oil, bbl
279K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Oct 2001 THROUGH Dec 2024

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Oct 23, 2001
Shut in
Feb 1, 2023
Plugged
—

Operator's P-5 on the schedule: Delinquent (D)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Remington G-14-185825Parsell (Morrow, Upper)BE Anadarko II, LLC12.48K279KOct 2001 – Dec 2024

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Range Production CompanyOct 2001 → Jun 2014
  2. 2Range Production Company, LLCJul 2014 → Dec 2017
  3. 3Winright Resources Operating,llcJan 2018 → Apr 2022
  4. 4BE Anadarko II, LLCOct 2022 → Jan 2023

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
506082-99DrillRange Production CompanyMar 5, 2001Mar 5, 2001Apr 30, 200113,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Oct 23, 2001Remington G-14-185825Parsell (Morrow Upper)BE Anadarko II LLCTemp Abandoned · shut in Feb 1, 202312,101

Formation tops

As filed on W-2/G-1. Subsea from 2,473 ft elevation.Download CSV →

FormationMD ftSubsea
Douglas6,484-4,011
Tonkawa7,170-4,697
MorrowMORROW SHALE10,307-7,834

Perforations

Perforated and open-hole intervals.

FromToType
10,43910,441Perforated
10,44610,464Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6252,52912.251,585 S
5.511,4007.875265 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Dec 21, 2001Nov 12, 2001Yes
00Dec 7, 2001——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/21132500, documented in the API reference.