TEXAS · WELLS · HEMPHILL COUNTY · WRIGHT LEASE · API 42-211-33119 · DISTRICT 08

Wright #7

Shut in

Hemphill County · Canadian SE (Douglas) field · Temp Abandoned  · Vertical

Wright #7 (API 42-211-33119) is a well in Hemphill County operated by United Oil & Shale LLC, completed September 30, 2005 and listed as temp abandoned on the RRC schedule, shut in July 1, 2013.

The RRC has issued one drilling permit (amended once), issued November 1, 2004, permitted to 7,755 ft.

It was permitted by Peak Operating Of Texas, LLC and has since transferred to United Oil & Shale LLC on the wellbore schedule.

Completion filings report 2 formation tops, including Brown Dolomite, Douglas.

Its lease has reported 67 barrels of oil and 5.33K mcf of gas since September 2005, with no volume in the three years through April 2026.

Operator of record

United Oil & Shale LLC

Permitted by Peak Operating of Texas, LLC; the EWA schedule now lists a different operator.

Based in
Woodward, OK
P-5 status
Active – Extension (X)
P-5 last filed
Mar 31, 2026
Phone
(806) 440-4844

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleUnited Oil & Shale LLC
Production reportsPresidio Petroleum LLCthrough Jun 2013
Latest permitPeak Operating of Texas, LLCNov 4, 2004

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

7,755
total depth, ft
2
permits on file
Nov 4, 2004
last permit issued
Sep 30, 2005
completed
67
cumulative oil, bbl
5.33K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Sep 2005 THROUGH Jun 2013

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Sep 30, 2005
Shut in
Jul 1, 2013
Plugged
—

Operator's P-5 on the schedule: Active – Extension (X)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Wright G-14-224294Canadian, SE (Douglas)Presidio Petroleum LLC1675.33KSep 2005 – Jun 2013

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Forest Oil CorporationSep 2005 → Jun 2013

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
552946-98DrillPeak Operating of Texas, LLCNov 3, 2004Nov 4, 2004Dec 2, 20048,000
552946-99DrillPeak Operating of Texas, LLCOct 28, 2004Nov 1, 2004—8,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Sep 30, 2005Wright G-14-224294Canadian SE (Douglas)United Oil & Shale LLCTemp Abandoned · shut in Jul 1, 20137,755

Formation tops

As filed on W-2/G-1. Subsea from 2,383 ft elevation.Download CSV →

FormationMD ftSubsea
Brown Dolomite3,920-1,537
Douglas7,244-4,861

Perforations

Perforated and open-hole intervals.

FromToType
7,3287,348Perforated
7,4627,504Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,67512.25825 S
4.57,7557.875225 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Apr 18, 2007Feb 16, 2007—
00Apr 17, 2007Mar 15, 2006—
00Apr 16, 2007Oct 3, 2005Yes
00Feb 6, 2007——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/21133119, documented in the API reference.