WELL · 42-211-33391 · DISTRICT 10
Carr 14 #1404P
Hemphill County · Buffalo Wallow (Granite Wash) field · Vertical
Carr 14 #1404P (API 42-211-33391) is a plugged well in Hemphill County, plugged July 2, 2019, last operated by Unit Petroleum Company.
The RRC has issued one drilling permit, issued August 19, 2005, permitted to 13,500 ft.
It was permitted by Noble Energy Production, Inc. and has since transferred to Unit Petroleum Company on the wellbore schedule.
Completion filings report 2 formation tops, including Brown Dolomite, Granite Wash.
Operator of record
Permitted by Noble Energy Production, Inc.; the EWA schedule now lists a different operator.
- Based in
- Tulsa, OK
- P-5 status
- Active (A)
- P-5 last filed
- Jan 13, 2025
- Permits on file
- 1,100
- Phone
- (918) 493-7700
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Unit Petroleum Company |
| Production reports | Unit Petroleum Companythrough Sep 2012 |
| Latest permit | Noble Energy Production, Inc.Aug 19, 2005 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 13,500
- total depth, ft
- 1
- permits on file
- Aug 19, 2005
- last permit issued
- Nov 26, 2015
- completed
- 0
- cumulative oil, bbl
- 91K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Nov 2005 THROUGH Jul 2019
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Nov 26, 2015
- Shut in
- —
- Plugged
- Jul 2, 2019
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Carr 14 G-14-219952 | Buffalo Wallow (Granite Wash) | Unit Petroleum Company | 1 | 0 | 91K | Nov 2005 – Jul 2019 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Noble Energy Production, Inc.Nov 2005 → Aug 2007
- 2Noble Energy IncSep 2007 → Jun 2011
- 3Unit Petroleum CompanySep 2012 → Sep 2012
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 605189-99 | Drill | Noble Energy Production, Inc. | Aug 18, 2005 | Aug 19, 2005 | Oct 9, 2005 | 13,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-14-219952 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,760 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Brown Dolomite | 4,050 | -1,290 |
| Granite WashGRANITE WASH A-1 | 11,150 | -8,390 |
| Granite WashGRANITE WASH B | 11,240 | -8,480 |
| Granite WashGRANITE WASH C | 11,497 | -8,737 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,205 | 4,600 | Perforated |
| 11,282 | 11,393 | Perforated |
| 11,515 | 11,589 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 3,205 | 11 | 1,405 S |
| 4.5 | 11,820 | 7.875 | 450 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 8, 2016 | Dec 10, 2015 | — |
| 00 | Feb 23, 2007 | Sep 22, 2006 | Yes |
| 00 | Oct 9, 2006 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-211-33391 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-211-33391 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/21133391, documented in the API reference.