TEXAS · WELLS · HEMPHILL COUNTY · CAMPBELL 53 LEASE · API 42-211-33430 · DISTRICT 08

Campbell 53 #5053

Shut in

Hemphill County · Mendota NW. (Granite Wash) field · Temp Abandoned  · Vertical

Campbell 53 #5053 (API 42-211-33430) is a well in Hemphill County operated by Bce-Mach Iii LLC, completed April 10, 2006 and listed as temp abandoned on the RRC schedule, shut in June 1, 2023.

The RRC has issued one drilling permit (amended once), issued November 8, 2005, permitted to 10,900 ft.

It was permitted by Gruy Petroleum Management CO. and has since transferred to Bce-Mach Iii LLC on the wellbore schedule.

Completion filings report 4 formation tops, including Douglas, Cherokee "A", Cherokee "E", Atoka.

No lease production has been reported under this well’s leases.

Operator of record

Bce-Mach III LLC

Permitted by Gruy Petroleum Management Co.; the EWA schedule now lists a different operator.

Based in
Oklahoma City, OK
P-5 status
Active – Extension (X)
P-5 last filed
May 18, 2026
Permits on file
10
Phone
(405) 252-8100

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleBce-Mach III LLC
Production reportsBce-Mach III LLCthrough May 2023
Latest permitGruy Petroleum Management Co.Nov 8, 2005

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

10,900
total depth, ft
2
permits on file
Nov 8, 2005
last permit issued
Apr 10, 2006
completed
0
cumulative oil, bbl
1.1M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Apr 2006 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Apr 10, 2006
Shut in
Jun 1, 2023
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Campbell 53 G-14-217357Mendota, NW. (Granite Wash)Bce-Mach III LLC101.1MApr 2006 – Jul 2026

Gas, mcf lease total

Last 12 months 0 · prior 12 0

02040202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Cimarex Energy Co. of ColoradoMay 2006 → May 2021
  2. 2Bce-Mach III LLCJun 2021 → May 2023

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
608361-98DrillGruy Petroleum Management Co.Feb 23, 2006Nov 8, 2005Mar 8, 200611,500
608361-99DrillGruy Petroleum Management Co.Oct 24, 2005Nov 8, 2005Mar 8, 200610,500

Completions

CompletedLeaseFieldOperatorStatusDepth
Apr 10, 2006Campbell 53 G-14-217357Mendota NW. (Granite Wash)Bce-Mach III LLCTemp Abandoned · shut in Jun 1, 202310,900

Formation tops

As filed on W-2/G-1. Subsea from 2,605 ft elevation.Download CSV →

FormationMD ftSubsea
DouglasDOUGLAS SAND7,028-4,423
Cherokee "A"9,522-6,917
Cherokee "E"10,290-7,685
Atoka10,645-8,040

Perforations

Perforated and open-hole intervals.

FromToType
10,00210,020Perforated
10,10910,203Perforated
10,38010,509Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6252,488111,040 S
5.510,9007.875310 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Nov 14, 2006May 30, 2006Yes
00Jul 27, 2006——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/21133430, documented in the API reference.