TEXAS · WELLS · HEMPHILL COUNTY · CARR-PEARSON 55 LEASE · API 42-211-33551 · DISTRICT 08

Carr-Pearson 55 #5527P

Plugged

Hemphill County · Buffalo Wallow (Granite Wash) field  · Vertical

Carr-Pearson 55 #5527P (API 42-211-33551) is a plugged well in Hemphill County, plugged May 24, 2021, last operated by Unit Petroleum Company.

The RRC has issued one drilling permit, issued March 10, 2006, permitted to 13,500 ft.

It was permitted by Noble Energy Production, Inc. and has since transferred to Unit Petroleum Company on the wellbore schedule.

Completion filings report 2 formation tops, including Oswego, Granite Wash.

Its lease has reported 3.84K barrels of oil and 496K mcf of gas since June 2006, with no volume in the three years through April 2026.

Operator of record

Unit Petroleum Company

Permitted by Noble Energy Production, Inc.; the EWA schedule now lists a different operator.

Based in
Tulsa, OK
P-5 status
Active (A)
P-5 last filed
Jan 13, 2025
Permits on file
1,100
Phone
(918) 493-7700

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleUnit Petroleum Company
Production reportsUnit Petroleum Companythrough Aug 2017
Latest permitNoble Energy Production, Inc.Mar 10, 2006

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

13,500
total depth, ft
1
permits on file
Mar 10, 2006
last permit issued
Jun 4, 2006
completed
3.84K
cumulative oil, bbl
496K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jun 2006 THROUGH Aug 2017

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jun 4, 2006
Shut in
—
Plugged
May 24, 2021

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Carr-Pearson 55 G-14-220630Buffalo Wallow (Granite Wash)Unit Petroleum Company13.84K496KJun 2006 – Aug 2017

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Noble Energy Production, Inc.Jun 2006 → Aug 2007
  2. 2Noble Energy IncSep 2007 → Aug 2012
  3. 3Unit Petroleum CompanySep 2012 → Aug 2017

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
615607-99DrillNoble Energy Production, Inc.Mar 9, 2006Mar 10, 2006Apr 28, 200613,500

Completions

CompletedLeaseFieldOperatorStatusDepth
Jun 4, 2006Carr-Pearson 55 G-14-220630Buffalo Wallow (Granite Wash)Unit Petroleum CompanyPlugged—

Formation tops

As filed on W-2/G-1. Subsea from 2,782 ft elevation.Download CSV →

FormationMD ftSubsea
Oswego10,673-7,891
Granite WashGRANITE WASH A-111,100-8,318
Granite WashGRANITE WASH B11,339-8,557
Granite WashGRANITE WASH C11,633-8,851

Perforations

Perforated and open-hole intervals.

FromToType
11,08811,213Perforated
11,39311,578Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6253,18512.251,750 S
4.511,9407.875450 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Feb 27, 2007Oct 23, 2006Yes
00Nov 1, 2006——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/21133551, documented in the API reference.