TEXAS · WELLS · HEMPHILL COUNTY · CARR 14 LEASE · API 42-211-33690 · DISTRICT 08

Carr 14 #1419P

Plugged

Hemphill County · Buffalo Wallow (Granite Wash) field  · Vertical

Carr 14 #1419P (API 42-211-33690) is a plugged well in Hemphill County, plugged November 4, 2022, last operated by Unit Petroleum Company.

The RRC has issued one drilling permit, issued August 28, 2006, permitted to 13,500 ft.

It was permitted by Noble Energy Production, Inc. and has since transferred to Unit Petroleum Company on the wellbore schedule.

Completion filings report 2 formation tops, including Oswego, Granite Wash.

Its lease has reported 4.36K barrels of oil and 398K mcf of gas since December 2006, with no volume in the three years through April 2026.

Operator of record

Unit Petroleum Company

Permitted by Noble Energy Production, Inc.; the EWA schedule now lists a different operator.

Based in
Tulsa, OK
P-5 status
Active (A)
P-5 last filed
Jan 13, 2025
Permits on file
1,100
Phone
(918) 493-7700

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleUnit Petroleum Company
Production reportsUnit Petroleum Companythrough Aug 2020
Latest permitNoble Energy Production, Inc.Aug 28, 2006

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

13,500
total depth, ft
1
permits on file
Aug 28, 2006
last permit issued
Dec 16, 2006
completed
4.36K
cumulative oil, bbl
398K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Dec 2006 THROUGH Aug 2020

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Dec 16, 2006
Shut in
—
Plugged
Nov 4, 2022

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Carr 14 G-14-252054Buffalo Wallow (Granite Wash)Unit Petroleum Company14.36K398KDec 2006 – Aug 2020

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Noble Energy Production, Inc.Dec 2006 → Aug 2007
  2. 2Noble Energy IncSep 2007 → Aug 2012
  3. 3Unit Petroleum CompanySep 2012 → Aug 2020

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
625027-99DrillNoble Energy Production, Inc.Aug 28, 2006Aug 28, 2006Oct 19, 200613,500

Completions

CompletedLeaseFieldOperatorStatusDepth
Dec 16, 2006Carr 14 G-14-252054Buffalo Wallow (Granite Wash)Unit Petroleum CompanyPlugged—

Formation tops

As filed on W-2/G-1. Subsea from 2,735 ft elevation.Download CSV →

FormationMD ftSubsea
Oswego10,542-7,807
Granite WashGRANITE WASH A-111,023-8,288
Granite WashGRANITE WASH B11,226-8,491
Granite WashGRANITE WASH C11,465-8,730

Perforations

Perforated and open-hole intervals.

FromToType
11,30211,413Perforated
11,49411,679Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6253,16012.251,750 S
4.511,7347.875410 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Dec 16, 2009Mar 9, 2007Yes
00Oct 27, 2009——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/21133690, documented in the API reference.