TEXAS · WELLS · HEMPHILL COUNTY · API 42-211-33832 · DISTRICT 08
Coffee 1 #7
Hemphill County · Mendota NW. (Granite Wash) field · Producing · Vertical
Coffee 1 #7 (API 42-211-33832) is a well in Hemphill County operated by Bce-Mach II LLC, completed April 4, 2007 and listed as producing on the RRC schedule.
The RRC has issued one drilling permit, issued January 29, 2007, permitted to 11,690 ft.
It was permitted by Dominion Oklahoma Texas E&P, Inc and has since transferred to Bce-Mach II LLC on the wellbore schedule.
Completion filings report 7 formation tops, including T/Brn. Dolomite, T/Brown Dolomite, B/Heebner Douglas, Cleveland.
Its 2 leases have reported 4.44K barrels of oil and 400K mcf of gas since April 2007, last reporting in July 2026. The leases carry 2 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Dominion Oklahoma Texas E&P, Inc; the EWA schedule now lists a different operator.
- Based in
- Oklahoma City, OK
- P-5 status
- Active (A)
- P-5 last filed
- Aug 14, 2025
- Phone
- (405) 252-8100
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Samson Lone Star LLC |
| Production reports | Bce-Mach II LLCthrough Apr 2026 |
| Latest permit | Dominion Oklahoma Texas E&P, IncJan 29, 2007 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 11,690
- total depth, ft
- 1
- permits on file
- Jan 29, 2007
- last permit issued
- Apr 4, 2007
- completed
- 4.44K
- cumulative oil, bbl
- 400K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Apr 2007 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Apr 4, 2007
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active (A)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Coffee 1 G-14-234217 | Mendota, NW. (Granite Wash) | Bce-Mach II LLC | 1 | 0 | 316K | Dec 2007 – Jul 2026 |
| Coffee 1 O-14-7746 | Mendota, NW. (Granite Wash) | Samson Lone Star, LLC | 1 | 4.44K | 83.7K | Apr 2007 – Apr 2014 |
Gas, mcf lease total
Last 12 months 6,052 · prior 12 6,466(-6%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Dominion Oklahoma Texas E&P, IncApr 2007 → Aug 2007
- 2Samson Lone Star, LLCSep 2007 → Aug 2015
- 3Enervest Operating, L.L.C.Oct 2015 → Aug 2019
- 4Bce-Mach II LLCSep 2019 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 632490-99 | Drill | Dominion Oklahoma Texas E&P, Inc | Jan 25, 2007 | Jan 29, 2007 | Feb 13, 2007 | 12,220 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Apr 4, 2007 | Coffee 1 G-14-234217 | Mendota NW. (Granite Wash) | Bce-Mach II LLC | Producing | 11,690 |
| Apr 10, 2007 | Coffee 1 O-14-7746 | Mendota NW. (Granite Wash) | Samson Lone Star LLC | Not on Schedule | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,674 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| T/Brn. Dolomite | 4,192 | -1,518 |
| T/Brown Dolomite | 4,192 | -1,518 |
| B/Heebner Douglas | 7,170 | -4,496 |
| ClevelandCLEVELAND MKR. | 8,963 | -6,289 |
| T/Britt Granite Wash | 9,662 | -6,988 |
| Granite WashGRANITE WASH D SHALE | 10,364 | -7,690 |
| AtokaATOKA WASH | 10,728 | -8,054 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 9,832 | 11,206 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 3,043 | 12.25 | 1,945 S |
| 5.5 | 11,688 | 7.875 | 470 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Apr 16, 2008 | Jan 4, 2008 | — |
| 00 | Apr 7, 2008 | — | — |
| 00 | Aug 3, 2007 | May 16, 2007 | Yes |
| 00 | Jul 6, 2007 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-211-33832 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-211-33832 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/21133832, documented in the API reference.