WELL · 42-211-33973 · DISTRICT 10

Shaller Frank #5

N

Hemphill County · Hemphill (Granite Wash.) field  · Vertical

Shaller Frank #5 (API 42-211-33973) is a well in Hemphill County operated by Unit Petroleum Company, completed March 6, 2008.

The RRC has issued 2 drilling permits between 2007 and 2015, permitted to 12,050 ft.

Completion filings report 9 formation tops, including Douglas, Tonkawa, Kansas City, Marmaton.

Its 3 leases have reported 11.2K barrels of oil and 457K mcf of gas since March 2008, last reporting in July 2026. The leases carry 4 wells, so these are lease totals, not this well alone.

Operator of record

Unit Petroleum Company

Based in
Tulsa, OK
P-5 status
Active (A)
P-5 last filed
Jan 13, 2025
Permits on file
1,100
Phone
(918) 493-7700

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleUnit Petroleum Company
Production reportsUnit Petroleum Companythrough Apr 2026
Latest permitUnit Petroleum CompanyDec 22, 2015
12,050
total depth, ft
2
permits on file
Dec 22, 2015
last permit issued
Mar 6, 2008
completed
11.2K
cumulative oil, bbl
457K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Mar 2008 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Mar 6, 2008
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 4 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Frank Shaller O-14-9512Canadian, SE (Douglas)Unit Petroleum Company14.76K154KOct 2016 – Jul 2026
Shaller, Frank G-14-258212Hemphill (Granite Wash.)Unit Petroleum Company1043.6KApr 2010 – May 2024
Shaller, Frank O-14-7875Hemphill (Granite Wash.)Unit Petroleum Company26.48K260KMar 2008 – Jan 2013

Gas, mcf lease total

Last 12 months 12,462 · prior 12 13,341(-7%)

05001K1.5K202420252026

Oil, barrels lease total

Last 12 months 406 · prior 12 397(+2%)

0204060202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Unit Petroleum CompanyMar 2008 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
812779-99RecompletionUnit Petroleum CompanyDec 17, 2015Dec 22, 2015Sep 19, 20167,700
643559-99DrillUnit Petroleum CompanyJul 31, 2007Aug 8, 2007Sep 8, 200712,050

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-14-258212————
—— O-14-7875————
—— O-14-9512————

Formation tops

As filed on W-2/G-1. Subsea from 2,466 ft elevation.Download CSV →

FormationMD ftSubsea
Douglas7,170-4,704
Tonkawa7,918-5,452
Kansas City8,420-5,954
Marmaton9,532-7,066
Mormaton9,532-7,066
Granite Wash9,920-7,454
Novi Lime11,616-9,150
13 Finger11,696-9,230
MorrowTOP MORROW11,844-9,378

Perforations

Perforated and open-hole intervals.

FromToType
7,2657,355Perforated
10,38810,411Perforated
10,41810,433Perforated
10,43610,454Perforated
10,46210,538Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6252,80212.251,020 S
5.510,8758.75535 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Apr 5, 2017Nov 30, 2016—
00Jan 11, 2011May 17, 2010—
00Dec 8, 2010——
00Sep 17, 2008Apr 10, 2008Yes
00Aug 29, 2008——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/21133973, documented in the API reference.