TEXAS · WELLS · HEMPHILL COUNTY · API 42-211-34095 · DISTRICT 08

Vollmert C #6

Shut in

Hemphill County · Mendota NW. (Granite Wash) field · Temp Abandoned  · Vertical

Vollmert C #6 (API 42-211-34095) is a well in Hemphill County operated by Unit Petroleum Company, completed March 31, 2008 and listed as temp abandoned on the RRC schedule, shut in December 1, 2018.

The RRC has issued one drilling permit (amended once), issued December 19, 2007, permitted to 11,000 ft.

Completion filings report 8 formation tops, including Brown Dolomite, Douglas, Kansas City, Cleveland.

Its 2 leases have reported 16.5K barrels of oil and 1.98M mcf of gas since July 2007, last reporting in July 2026. The leases carry 3 wells, so these are lease totals, not this well alone.

Operator of record

Unit Petroleum Company

Based in
Tulsa, OK
P-5 status
Active (A)
P-5 last filed
Jan 13, 2025
Permits on file
1,100
Phone
(918) 493-7700

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleUnit Petroleum Company
Production reportsUnit Petroleum Companythrough Nov 2018
Latest permitUnit Petroleum CompanyDec 19, 2007
11,000
total depth, ft
2
permits on file
Dec 19, 2007
last permit issued
Mar 31, 2008
completed
16.5K
cumulative oil, bbl
1.98M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jul 2007 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Mar 31, 2008
Shut in
Dec 1, 2018
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Vollmert "C" G-14-241781Mendota, NW. (Granite Wash, SW.)Unit Petroleum Company101.44MSep 2008 – Jul 2026
Vollmert "C" O-14-7779Mendota, NW. (Granite Wash, SW.)Unit Petroleum Company216.5K531KJul 2007 – Mar 2009

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Unit Petroleum CompanyJul 2007 → Nov 2018

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
651466-98DrillUnit Petroleum CompanyJan 14, 2008Dec 19, 2007Feb 10, 200810,900
651466-99DrillUnit Petroleum CompanyDec 14, 2007Dec 19, 2007Feb 10, 200810,900

Completions

CompletedLeaseFieldOperatorStatusDepth
Mar 31, 2008Vollmert C G-14-241781Mendota NW. (Granite Wash)Unit Petroleum CompanyTemp Abandoned · shut in Dec 1, 201811,000
Mar 31, 2008Vollmert C O-14-7779Mendota NW. (Granite Wash SW.)Unit Petroleum CompanyNot on Schedule—

Formation tops

As filed on W-2/G-1. Subsea from 2,810 ft elevation.Download CSV →

FormationMD ftSubsea
Brown Dolomite4,133-1,323
Douglas7,025-4,215
Kansas City8,223-5,413
Cleveland8,776-5,966
Marmaton9,184-6,374
Granite Wash9,616-6,806
Novi10,876-8,066
13 Finger10,950-8,140

Perforations

Perforated and open-hole intervals.

FromToType
9,8169,821Perforated
10,02010,025Perforated
10,05410,063Perforated
10,07910,083Perforated
10,17110,181Perforated
10,19110,212Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6252,83712.25985 S
5.510,5467.875275 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Apr 21, 2009Oct 2, 2008—
00Nov 5, 2008——
00Oct 6, 2008Jun 6, 2008Yes
00Aug 8, 2008——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/21134095, documented in the API reference.