WELL · 42-211-34463 · DISTRICT 10

Prescott 21 #12 H

Shut in

Hemphill County · Hemphill (Granite Wash.) field · Producing  · Horizontal

Prescott 21 #12 H (API 42-211-34463) is a horizontal well in Hemphill County operated by Mmgl Txph LLC, completed January 14, 2011 and listed as producing on the RRC schedule, shut in February 1, 2026.

The RRC has issued one drilling permit (amended once), issued October 4, 2008, permitted to 10,919 ft.

It was permitted by Devon Energy Production CO, L.P. and has since transferred to Mmgl Txph LLC on the wellbore schedule.

Completion filings report 4 formation tops, including Grws A, Grws Caldwell, Grws Cherokee, Oswego.

No lease production has been reported under this well’s leases.

Operator of record

Mmgl Txph LLC

Permitted by Devon Energy Production Co, L.P.; the EWA schedule now lists a different operator.

Based in
Dallas, TX
P-5 status
Active (A)
P-5 last filed
Jul 24, 2025
Permits on file
10
Phone
(972) 701-8377

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleMmgl Txph LLC
Production reportsMmgl Txph, LLCthrough Jan 2026
Latest permitDevon Energy Production Co, L.P.Oct 4, 2008

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

10,919
total depth, ft
2
permits on file
Oct 4, 2008
last permit issued
Jan 14, 2011
completed
0
cumulative oil, bbl
2.54M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 2011 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jan 14, 2011
Shut in
Feb 1, 2026
Plugged
—

Operator's P-5 on the schedule: Active – Extension (X)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Prescott 21 G-14-265136Hemphill (Granite Wash.)Mmgl Txph, LLC102.54MJan 2011 – Jul 2026

Gas, mcf lease total

Last 12 months 2,110 · prior 12 46,873(-95%)

05K10K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Devon Energy Production Co, L.P.Jan 2011 → Jun 2016
  2. 2Tecolote Energy Operating, LLCJul 2016 → Dec 2019
  3. 3Blackbeard Operating, LLCJan 2020 → Sep 2023
  4. 4Mmgl Txph, LLCOct 2023 → Jan 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
671542-98DrillDevon Energy Production Co, L.P.Jul 1, 2010Oct 4, 2008Oct 16, 201012,000
671542-99DrillDevon Energy Production Co, L.P.Sep 19, 2008Oct 4, 2008Oct 16, 201012,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Jan 14, 2011Prescott 21 G-14-265136Hemphill (Granite Wash.)Mmgl Txph LLCProducing · shut in Feb 1, 202610,919

Formation tops

As filed on W-2/G-1. Subsea from 2,529 ft elevation.Download CSV →

FormationMD ftSubsea
Grws A——
Grws Caldwell——
Grws Cherokee——
Oswego——

Perforations

Perforated and open-hole intervals.

FromToType
11,04014,493Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.37565017.5900 S
9.6256,19612.5680 S
9.6257,82612.25480 S
5.514,6248.751,500 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Nov 5, 2012Apr 4, 2011Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/21134463, documented in the API reference.