TEXAS · WELLS · HEMPHILL COUNTY · HUFF 16 LEASE · API 42-211-34647 · DISTRICT 08

Huff 16 #5 H

Y

Hemphill County · Buffalo Wallow (Granite Wash) field · Producing  · Horizontal

Huff 16 #5 H (API 42-211-34647) is a horizontal well in Hemphill County operated by Mmgl Txph LLC, completed March 11, 2010 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit (amended once), issued November 23, 2009, permitted to 11,369 ft.

It was permitted by Cimarex Energy CO. and has since transferred to Mmgl Txph LLC on the wellbore schedule.

Completion filings report 5 formation tops, including Douglas, Checker Board, Cleveland, Oswego.

Its lease has reported 53.9K barrels of oil and 3.83M mcf of gas since February 2010, last reporting volume in April 2026.

Operator of record

Mmgl Txph LLC

Permitted by Cimarex Energy Co.; the EWA schedule now lists a different operator.

Based in
Dallas, TX
P-5 status
Active (A)
P-5 last filed
Jul 24, 2025
Permits on file
10
Phone
(972) 701-8377

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleMmgl Txph LLC
Production reportsMmgl Txph, LLCthrough Apr 2026
Latest permitCimarex Energy Co.Nov 23, 2009

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

11,369
total depth, ft
2
permits on file
Nov 23, 2009
last permit issued
Mar 11, 2010
completed
53.9K
cumulative oil, bbl
3.83M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Feb 2010 THROUGH Apr 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Mar 11, 2010
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active – Extension (X)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Huff 16 G-14-258037Buffalo Wallow (Granite Wash)Mmgl Txph, LLC153.9K3.83MFeb 2010 – Apr 2026

Gas, mcf lease total

Last 12 months 53,427 · prior 12 41,360(+29%)

05K10K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Cimarex Energy Co.Feb 2010 → Aug 2021
  2. 2Blackbeard Operating, LLCSep 2021 → Sep 2023
  3. 3Mmgl Txph, LLCOct 2023 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
687669-98DrillCimarex Energy Co.Feb 9, 2010Nov 23, 2009Dec 4, 200912,000
687669-99DrillCimarex Energy Co.Nov 19, 2009Nov 23, 2009Dec 4, 200912,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Mar 11, 2010Huff 16 G-14-258037Buffalo Wallow (Granite Wash)Mmgl Txph LLCProducing11,369

Formation tops

As filed on W-2/G-1. Subsea from 2,580 ft elevation.Download CSV →

FormationMD ftSubsea
Douglas8,124-5,544
Checker Board10,170-7,590
Cleveland10,266-7,686
Oswego11,032-8,452
Granite WashGRANITE WASH A111,377-8,797
Granite WashGRANITE WASH A211,498-8,918

Perforations

Perforated and open-hole intervals.

FromToType
11,61015,815Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6252,495111,449 S
711,5389460 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Dec 6, 2010Apr 1, 2010Yes
00Nov 29, 2010——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/21134647, documented in the API reference.