TEXAS · WELLS · HEMPHILL COUNTY · GEORGE 17 LEASE · API 42-211-34693 · DISTRICT 08

George 17 #4H

Y

Hemphill County · Buffalo Wallow (Granite Wash) field · Producing  · Horizontal

George 17 #4H (API 42-211-34693) is a horizontal well in Hemphill County operated by Bce-Mach Iii LLC, completed July 16, 2010 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued March 17, 2010, permitted to 11,368 ft.

It was permitted by Cimarex Energy CO. and has since transferred to Bce-Mach Iii LLC on the wellbore schedule.

Completion filings report 4 formation tops, including Checkerboard, Oswego, Cherokee Gw A1, Cherokee Gw A2.

Its lease has reported 35K barrels of oil and 1.41M mcf of gas since June 2010, last reporting volume in April 2026.

Operator of record

Bce-Mach III LLC

Permitted by Cimarex Energy Co.; the EWA schedule now lists a different operator.

Based in
Oklahoma City, OK
P-5 status
Active – Extension (X)
P-5 last filed
May 18, 2026
Permits on file
10
Phone
(405) 252-8100

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleBce-Mach III LLC
Production reportsBce-Mach III LLCthrough Apr 2026
Latest permitCimarex Energy Co.Mar 17, 2010

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

11,368
total depth, ft
1
permits on file
Mar 17, 2010
last permit issued
Jul 16, 2010
completed
35K
cumulative oil, bbl
1.41M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jun 2010 THROUGH Apr 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jul 16, 2010
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
George 17 G-14-261782Buffalo Wallow (Granite Wash)Bce-Mach III LLC135K1.41MJun 2010 – Apr 2026

Gas, mcf lease total

Last 12 months 24,736 · prior 12 24,199(+2%)

01K2K3K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Cimarex Energy Co.Jun 2010 → May 2021
  2. 2Bce-Mach III LLCJun 2021 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
692797-99DrillCimarex Energy Co.Mar 12, 2010Mar 17, 2010Apr 1, 201012,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Jul 16, 2010George 17 G-14-261782Buffalo Wallow (Granite Wash)Bce-Mach III LLCProducing11,368

Formation tops

As filed on W-2/G-1. Subsea from 2,515 ft elevation.Download CSV →

FormationMD ftSubsea
Checkerboard10,070-7,555
Oswego10,944-8,429
Cherokee GW A111,290-8,775
Cherokee GW A211,410-8,895

Perforations

Perforated and open-hole intervals.

FromToType
11,71113,595Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6252,49012.251,446 S
711,4578.75527 S
4.513,7186.125350 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Jan 10, 2012Oct 18, 2010Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/21134693, documented in the API reference.