TEXAS · WELLS · HEMPHILL COUNTY · HALEY 153 LEASE · API 42-211-34953 · DISTRICT 08
Haley 153 #1
Hemphill County · Mathers Ranch (Morrow UP) field · Producing · Directional
Haley 153 #1 (API 42-211-34953) is a well in Hemphill County operated by Unit Petroleum Company, completed March 16, 2012 and listed as producing on the RRC schedule.
The RRC has issued one drilling permit, issued September 21, 2011, permitted to 12,164 ft.
Completion filings report 3 formation tops, including Douglas, Granite Wash, Morrow.
Its lease has reported 589 barrels of oil and 15.9M mcf of gas since March 2012, last reporting volume in April 2026.
Operator of record
- Based in
- Tulsa, OK
- P-5 status
- Active (A)
- P-5 last filed
- Jan 13, 2025
- Permits on file
- 1,100
- Phone
- (918) 493-7700
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Unit Petroleum Company |
| Production reports | Unit Petroleum Companythrough Apr 2026 |
| Latest permit | Unit Petroleum CompanySep 21, 2011 |
- 12,164
- total depth, ft
- 1
- permits on file
- Sep 21, 2011
- last permit issued
- Mar 16, 2012
- completed
- 589
- cumulative oil, bbl
- 15.9M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Mar 2012 THROUGH Apr 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Mar 16, 2012
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active (A)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Haley 153 G-14-267734 | Mathers Ranch (Morrow, UP) | Unit Petroleum Company | 1 | 589 | 15.9M | Mar 2012 – Apr 2026 |
Gas, mcf lease total
Last 12 months 494,272 · prior 12 458,996(+8%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Unit Petroleum CompanyMar 2012 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 724240-99 | Drill | Unit Petroleum Company | Sep 14, 2011 | Sep 21, 2011 | Dec 3, 2011 | 12,200 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Mar 16, 2012 | Haley 153 G-14-267734 | Mathers Ranch (Morrow UP) | Unit Petroleum Company | Producing | 12,164 |
Formation tops
As filed on W-2/G-1. Subsea from 2,411 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Douglas | 7,118 | -4,707 |
| Granite Wash | 10,523 | -8,112 |
| Morrow | 11,806 | -9,395 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 12,134 | 12,154 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 444 | 17.5 | 575 S |
| 9.625 | 2,485 | 12.25 | 1,400 S |
| 7 | 9,696 | 8.75 | 230 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | May 17, 2013 | Apr 9, 2013 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-211-34953 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-211-34953 → scanned completion filings
Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/21134953, documented in the API reference.