TEXAS · WELLS · HEMPHILL COUNTY · BRAINARD 27 LEASE · API 42-211-35007 · DISTRICT 08

Brainard 27 #1H

Y

Hemphill County · Lipscomb S.E. (Cleveland) field · Producing  · Horizontal

Brainard 27 #1H (API 42-211-35007) is a horizontal well in Hemphill County operated by BE Anadarko II LLC, completed October 9, 2012 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued February 28, 2012, permitted to 8,218 ft.

It was permitted by Le Norman Operating LLC and has since transferred to BE Anadarko II LLC on the wellbore schedule.

Completion filings report 3 formation tops, including Hogshooter, Checkerboard, Cleveland.

Its lease has reported 39.2K barrels of oil and 248K mcf of gas since October 2012, last reporting volume in April 2026.

Operator of record

BE Anadarko II LLC

Permitted by Le Norman Operating LLC; the EWA schedule now lists a different operator.

Based in
Austin, TX
P-5 status
Active (A)
P-5 last filed
Nov 19, 2025
Permits on file
2
Phone
(917) 204-3126

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleBE Anadarko II LLC
Production reportsBE Anadarko II, LLCthrough Apr 2026
Latest permitLe Norman Operating LLCFeb 28, 2012

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

8,218
total depth, ft
1
permits on file
Feb 28, 2012
last permit issued
Oct 9, 2012
completed
39.2K
cumulative oil, bbl
248K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Oct 2012 THROUGH Apr 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Oct 9, 2012
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Delinquent (D)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Brainard 27 O-14-8837Lipscomb, S.E. (Cleveland)BE Anadarko II, LLC139.2K248KOct 2012 – Apr 2026

Gas, mcf lease total

Last 12 months 15,335 · prior 12 14,119(+9%)

01K2K202420252026

Oil, barrels lease total

Last 12 months 1,410 · prior 12 1,335(+6%)

0100200300202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Le Norman Operating LLCOct 2012 → Mar 2013
  2. 2Sabine Oil & Gas LLCApr 2013 → Nov 2013
  3. 3Jones Energy, LLCDec 2013 → Feb 2020
  4. 4Revolution Operating Company,llcDec 2020 → Mar 2024
  5. 5BE Anadarko II, LLCApr 2024 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
734037-99DrillLe Norman Operating LLCFeb 16, 2012Feb 28, 2012Jul 30, 20128,250

Completions

CompletedLeaseFieldOperatorStatusDepth
Oct 9, 2012Brainard 27 O-14-8837Lipscomb S.E. (Cleveland)BE Anadarko II LLCProducing8,218

Formation tops

As filed on W-2/G-1. Subsea from 2,622 ft elevation.Download CSV →

FormationMD ftSubsea
Hogshooter7,954-5,332
Checkerboard8,095-5,473
Cleveland8,164-5,542

Perforations

Perforated and open-hole intervals.

FromToType
8,53512,810Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6252,02012.25990 S
78,5358.75580 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Apr 15, 2014Jan 6, 2013Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/21135007, documented in the API reference.