WELL · 42-211-35180 · DISTRICT 10

Young 66 (Allocation) #1H

Y

Hemphill County · St. Clair (Granite Wash) field · Producing  · Horizontal

Young 66 (Allocation) #1H (API 42-211-35180) is a horizontal well in Hemphill County operated by Mmgl Txph LLC, completed October 16, 2013 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit (amended once), issued April 29, 2013, permitted to 9,409 ft.

It was permitted by Devon Energy Production CO, L.P. and has since transferred to Mmgl Txph LLC on the wellbore schedule.

Completion filings report 3 formation tops, including Tonkawa, Avant, Hogshooter.

Its lease has reported 47.5K barrels of oil and 211K mcf of gas since October 2013, last reporting in July 2026.

Operator of record

Mmgl Txph LLC

Permitted by Devon Energy Production Co, L.P.; the EWA schedule now lists a different operator.

Based in
Dallas, TX
P-5 status
Active (A)
P-5 last filed
Jul 24, 2025
Permits on file
10
Phone
(972) 701-8377

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleMmgl Txph LLC
Production reportsMmgl Txph, LLCthrough Apr 2026
Latest permitDevon Energy Production Co, L.P.Apr 29, 2013

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

9,409
total depth, ft
2
permits on file
Apr 29, 2013
last permit issued
Oct 16, 2013
completed
47.5K
cumulative oil, bbl
211K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Oct 2013 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Oct 16, 2013
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active – Extension (X)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Young 66 (Allocation) O-14-9177St. Clair (Granite Wash)Mmgl Txph, LLC147.5K211KOct 2013 – Jul 2026

Gas, mcf lease total

Last 12 months 18,615 · prior 12 18,177(+2%)

01K2K3K202420252026

Oil, barrels lease total

Last 12 months 1,406 · prior 12 1,234(+14%)

0100200202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Devon Energy Production Co, L.P.Oct 2013 → Jun 2016
  2. 2Tecolote Energy Operating, LLCJul 2016 → Dec 2019
  3. 3Blackbeard Operating, LLCJan 2020 → Sep 2023
  4. 4Mmgl Txph, LLCOct 2023 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
761362-98DrillDevon Energy Production Co, L.P.Feb 7, 2014Apr 29, 2013Jul 10, 201310,800
761362-99DrillDevon Energy Production Co, L.P.Apr 23, 2013Apr 29, 2013Jul 10, 201310,800

Completions

CompletedLeaseFieldOperatorStatusDepth
Oct 16, 2013Young 66 (Allocation) O-14-9177St. Clair (Granite Wash)Mmgl Txph LLCProducing9,409

Formation tops

As filed on W-2/G-1. Subsea from 2,668 ft elevation.Download CSV →

FormationMD ftSubsea
Tonkawa8,456-5,788
Avant8,971-6,303
Hogshooter9,179-6,511

Perforations

Perforated and open-hole intervals.

FromToType
9,27518,628Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.37579817.51,670 S
9.6257,92212.25750 S
5.518,7248.753,000 S
9.625—12.25710 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Dec 15, 2014Nov 7, 2013Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/21135180, documented in the API reference.