WELL · 42-211-35200 · DISTRICT 10

Roach 70 HMH #1H

N

Hemphill County · Achilles (Tonkawa) field  · Horizontal

Roach 70 Hmh #1H (API 42-211-35200) is a horizontal well in Hemphill County operated by Chesapeake Operating Inc., completed July 26, 2013.

The RRC has issued one drilling permit (amended once), issued June 4, 2013, permitted to 9,500 ft.

Completion filings report 4 formation tops, including Hebber, Heeber, Douglas, Tonkawa.

Its 2 leases have reported 159K barrels of oil and 921K mcf of gas since July 2013, last reporting in July 2026. The leases carry 2 wells, so these are lease totals, not this well alone.

Operator of record

Chesapeake Operating Inc.

Based in
Oklahoma City, OK
P-5 status
Delinquent (D)
P-5 last filed
Dec 10, 2024
Permits on file
13,061
Phone
(405) 935-3100

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleChesapeake Operating Inc.
Production reportsUnbridled Resources, LLCthrough Apr 2026
Latest permitChesapeake Operating, Inc.Jun 4, 2013

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

9,500
total depth, ft
2
permits on file
Jun 4, 2013
last permit issued
Jul 26, 2013
completed
159K
cumulative oil, bbl
921K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jul 2013 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jul 26, 2013
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Roach 70 HMH O-14-9002Achilles (Tonkawa)Unbridled Resources, LLC1159K921KSep 2013 – Jul 2026
Roach 70 HMH G-14-271839Achilles (Tonkawa)Chesapeake Operating, Inc.100Jul 2013 – Sep 2013

Gas, mcf lease total

Last 12 months 25,914 · prior 12 26,872(-4%)

02K4K202420252026

Oil, barrels lease total

Last 12 months 2,400 · prior 12 2,660(-10%)

0200400202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Chesapeake Operating, Inc.Sep 2013 → Oct 2014
  2. 2Chesapeake Operating, L.L.C.Nov 2014 → Jun 2016
  3. 34P Energy Texas, LLCJul 2016 → Oct 2020
  4. 4Unbridled Resources, LLCNov 2020 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
763735-98DrillChesapeake Operating, Inc.Jul 3, 2013Jun 4, 2013Jul 6, 20139,500
763735-99DrillChesapeake Operating, Inc.May 30, 2013Jun 4, 2013Jul 5, 20139,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-14-271839————
—— O-14-9002————

Formation tops

As filed on W-2/G-1. Subsea from 2,446 ft elevation.Download CSV →

FormationMD ftSubsea
Hebber7,676-5,230
Heeber7,676-5,230
Douglas7,795-5,349
Tonkawa8,562-6,116

Perforations

Perforated and open-hole intervals.

FromToType
8,67013,390Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.37545017.5590 S
9.6251,50612.25590 S
78,0868.75425 S
4.513,4856.25500 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Aug 27, 2014Nov 25, 2013Yes
00Apr 25, 2014Aug 28, 2013Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/21135200, documented in the API reference.