WELL · 42-211-35330 · DISTRICT 10

Urschel 73 #1H

N

Hemphill County · Lipscomb S.E. (Cleveland) field  · Horizontal

Urschel 73 #1H (API 42-211-35330) is a horizontal well in Hemphill County operated by Le Norman Operating LLC, completed August 4, 2014.

The RRC has issued one drilling permit (amended once), issued May 7, 2014, permitted to 9,000 ft.

Completion filings report 15 formation tops, including Brown Dolomite, Brownsville, Douglas, Tonkawa.

Its 2 leases have reported 40.9K barrels of oil and 247K mcf of gas since August 2014, last reporting in July 2026. The leases carry 2 wells, so these are lease totals, not this well alone.

Operator of record

LE Norman Operating LLC

Based in
Oklahoma City, OK
P-5 status
Inactive (I)
P-5 last filed
Oct 31, 2018
Permits on file
372
Phone
(405) 548-1200

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleLE Norman Operating LLC
Production reportsPresidio Petroleum LLCthrough Apr 2026
Latest permitLE Norman Operating LLCMay 7, 2014

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

9,000
total depth, ft
2
permits on file
May 7, 2014
last permit issued
Aug 4, 2014
completed
40.9K
cumulative oil, bbl
247K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Aug 2014 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Aug 4, 2014
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Urschel 73 G-14-278967Lipscomb, S.E. (Cleveland)Presidio Petroleum LLC10164KNov 2015 – Jul 2026
Urschel 73 O-14-9213Lipscomb, S.E. (Cleveland)LE Norman Operating LLC140.9K83.5KAug 2014 – Mar 2016

Gas, mcf lease total

Last 12 months 9,915 · prior 12 9,467(+5%)

05001K1.5K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1LE Norman Operating LLCAug 2014 → Jun 2019
  2. 2Templar Operating LLCJul 2019 → Dec 2019
  3. 3Presidio Petroleum LLCJan 2020 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
785735-98DrillLE Norman Operating LLCJun 3, 2014May 7, 2014May 29, 20149,000
785735-99DrillLE Norman Operating LLCApr 29, 2014May 7, 2014May 29, 20149,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-14-278967————
—— O-14-9213————

Formation tops

As filed on W-2/G-1. Subsea from 2,620 ft elevation.Download CSV →

FormationMD ftSubsea
Brown DolomiteBROWN DOLOMITE - PROD, PRESSURED3,842-1,222
Brownsville5,668-3,048
Douglas6,862-4,242
Tonkawa7,528-4,908
Kansas CityKANSAS CITY (HOGSHOOTER)8,519-5,899
Cleveland8,719-6,099
Atoka——
Cherokee——
Des Moines——
Granite Washes (Hepler)——
Novi——
OswegoOSWEGO UPPER——
PennsylvanianPENNSYLVANIAN (MARMATON)——
PennsylvanianPENNSYLVANIAN SAND——
Topeka——
MorrowUPPER MORROW - H2S CORROSIVE——

Perforations

Perforated and open-hole intervals.

FromToType
9,01413,111Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,49512.25800 S
78,0188.75400 S
4.513,2396.125560 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Feb 1, 2016Jan 18, 2016Yes
00Feb 12, 2015Nov 10, 2014Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/21135330, documented in the API reference.