WELL · 42-211-35394 · DISTRICT 10

Nix B #2024H

N

Hemphill County · Lipscomb S.E. (Cleveland) field  · Horizontal

Nix B #2024H (API 42-211-35394) is a horizontal well in Hemphill County operated by Le Norman Operating LLC, completed February 24, 2015.

The RRC has issued one drilling permit, issued August 20, 2014, permitted to 9,000 ft.

Completion filings report 9 formation tops, including Brown Dolomite, Brownsville, Douglas, Tonkawa.

Its 2 leases have reported 62.7K barrels of oil and 385K mcf of gas since May 2012, last reporting in July 2026. The leases carry 3 wells, so these are lease totals, not this well alone.

Operator of record

LE Norman Operating LLC

Based in
Oklahoma City, OK
P-5 status
Inactive (I)
P-5 last filed
Oct 31, 2018
Permits on file
372
Phone
(405) 548-1200

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleLE Norman Operating LLC
Production reportsPresidio Petroleum LLCthrough Apr 2026
Latest permitLE Norman Operating LLCAug 20, 2014

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

9,000
total depth, ft
1
permits on file
Aug 20, 2014
last permit issued
Feb 24, 2015
completed
62.7K
cumulative oil, bbl
385K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · May 2012 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Feb 24, 2015
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Nix B G-14-279077Lipscomb, S.E. (Cleveland)Presidio Petroleum LLC10234KNov 2015 – Jul 2026
Nix B O-14-8682Lipscomb, S.E. (Cleveland)LE Norman Operating LLC262.7K151KMay 2012 – Aug 2016

Gas, mcf lease total

Last 12 months 5,067 · prior 12 6,539(-23%)

01K2K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Forest Oil CorporationMay 2012 → Nov 2013
  2. 2LE Norman Operating LLCDec 2013 → Jun 2019
  3. 3Templar Operating LLCJul 2019 → Dec 2019
  4. 4Presidio Petroleum LLCJan 2020 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
792243-99DrillLE Norman Operating LLCJul 22, 2014Aug 20, 2014Dec 26, 20149,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-14-279077————
—— O-14-8682————

Formation tops

As filed on W-2/G-1. Subsea from 2,655 ft elevation.Download CSV →

FormationMD ftSubsea
Brown DolomiteBROWN DOLOMITE - PROD, PRESSURED3,784-1,129
Brownsville5,447-2,792
Douglas6,609-3,954
Tonkawa7,332-4,677
Kansas CityKANSAS CITY (HOGSHOOTER)8,159-5,504
Cleveland8,421-5,766
OswegoOSWEGO UPPER——
PennsylvanianPENNSYLVANIAN (MARMATON)——
PennsylvanianPENNSYLVANIAN SAND——
Topeka——

Perforations

Perforated and open-hole intervals.

FromToType
8,91013,380Open hole

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,48512.25815 S
78,9108.75520 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Feb 8, 2016Jan 18, 2016Yes
00Jul 24, 2015Mar 30, 2015Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/21135394, documented in the API reference.