WELL · 42-211-35488 · DISTRICT 10

Spur 9 #1H

N

Hemphill County · Hemphill (Douglas) field  · Horizontal

Spur 9 #1H (API 42-211-35488) is a horizontal well in Hemphill County operated by Le Norman Operating LLC, completed June 26, 2015.

The RRC has issued one drilling permit, issued March 11, 2015, permitted to 9,000 ft.

Completion filings report 12 formation tops, including Brown Dolomite, Topeka, Brownsville, Douglas.

Its 2 leases have reported 86.5K barrels of oil and 600K mcf of gas since June 2015, last reporting in July 2026. The leases carry 2 wells, so these are lease totals, not this well alone.

Operator of record

LE Norman Operating LLC

Based in
Oklahoma City, OK
P-5 status
Inactive (I)
P-5 last filed
Oct 31, 2018
Permits on file
372
Phone
(405) 548-1200

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleLE Norman Operating LLC
Production reportsPresidio Petroleum LLCthrough Apr 2026
Latest permitLE Norman Operating LLCMar 11, 2015

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

9,000
total depth, ft
1
permits on file
Mar 11, 2015
last permit issued
Jun 26, 2015
completed
86.5K
cumulative oil, bbl
600K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jun 2015 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jun 26, 2015
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Spur 9 G-14-280977Hemphill (Douglas)Presidio Petroleum LLC10387KAug 2016 – Jul 2026
Spur 9 O-14-9377Hemphill (Douglas)LE Norman Operating LLC186.5K213KJun 2015 – Feb 2017

Gas, mcf lease total

Last 12 months 24,256 · prior 12 36,476(-34%)

02K4K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1LE Norman Operating LLCJun 2015 → Jun 2019
  2. 2Templar Operating LLCJul 2019 → Dec 2019
  3. 3Presidio Petroleum LLCJan 2020 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
804336-99DrillLE Norman Operating LLCMar 4, 2015Mar 11, 2015May 13, 20159,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-14-280977————
—— O-14-9377————

Formation tops

As filed on W-2/G-1. Subsea from 2,441 ft elevation.Download CSV →

FormationMD ftSubsea
Brown DolomiteBROWN DOLOMITE - PROD, PRESSURED4,301-1,860
Topeka5,805-3,364
Brownsville6,220-3,779
Douglas8,110-5,669
Cleveland——
EllenburgerELLENBURGER - H2S CORROSIVE——
Hunton - H2S Corrosive——
Kansas CityKANSAS CITY (HOGSHOOTER)——
OswegoOSWEGO UPPER——
PennsylvanianPENNSYLVANIAN (MARMATON)——
PennsylvanianPENNSYLVANIAN SAND——
SimpsonSIMPSON - H2S CORROSIVE——
Tonkawa——

Perforations

Perforated and open-hole intervals.

FromToType
8,52912,996Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,51812.25815 S
78,5028.75490 S
4.513,0946.125600 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Oct 14, 2016Sep 7, 2016Yes
00Sep 28, 2015Aug 4, 2015Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/21135488, documented in the API reference.