WELL · 42-213-30410 · DISTRICT 5

Parker #1

Plugged

Henderson County · Opelika (Travis Peak) field  · Vertical

Parker #1 (API 42-213-30410) is a plugged well in Henderson County, plugged June 11, 2015, last operated by Sonat Exploration Company -Tyler.

The RRC has issued one drilling permit, issued March 23, 1984, permitted to 10,750 ft.

It was permitted by Marshall Expl. Inc. and has since transferred to Sonat Exploration Company -Tyler on the wellbore schedule.

Completion filings report 7 formation tops, including B/Austin Chalk, Georgetown, Glen Rose, BMA.

Its 3 leases have reported 1.7K barrels of oil and 450K mcf of gas since January 1993, last reporting in July 2019. The leases carry 2 wells, so these are lease totals, not this well alone.

Operator of record

Sonat Exploration Company -Tyler

Permitted by Marshall Expl. Inc.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Inactive (I)
P-5 last filed
Jun 29, 1992
Permits on file
655
Phone
(903) 561-3360

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleSonat Exploration Company -Tyler
Production reportsBuffco Production Inc.through Oct 2013
Latest permitMarshall Expl. Inc.Mar 23, 1984

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

10,750
total depth, ft
1
permits on file
Mar 23, 1984
last permit issued
May 30, 1984
completed
1.7K
cumulative oil, bbl
450K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2019

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
May 30, 1984
Shut in
—
Plugged
Jun 11, 2015

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Parker G-5-154845Opelika (Travis Peak)Buffco Production Inc.10358KMay 1995 – Jul 2019
Parker O-5-2775Opelika (Travis Peak)Sonat Exploration Company -Tyler11.7K92.1KJan 1993 – Jul 1996
— G-5-111723——000—

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Sonat Exploration Company -TylerJan 1993 → Oct 1999
  2. 2EL Paso Production CompanyApr 2000 → Apr 2000
  3. 3Buffco Production Inc.Feb 2002 → Oct 2013

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
234186-99DrillMarshall Expl. Inc.Feb 17, 1984Mar 23, 1984—10,750

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-5-111723————
—— G-5-154845————
—— O-5-2775————

Formation tops

As filed on W-2/G-1. Subsea from 412 ft elevation.Download CSV →

FormationMD ftSubsea
B/Austin Chalk4,088-3,676
Georgetown5,550-5,138
Glen RoseGLENROSE6,740-6,328
BMA8,490-8,078
B/Massive Anhydrite8,490-8,078
Pettit9,010-8,598
Travis Peak9,190-8,778

Perforations

Perforated and open-hole intervals.

FromToType
9,2409,958Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,24112.25600 sx
5.510,0008.75650 sx

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Oct 12, 1995May 30, 1995—
00Aug 3, 1995——
00Jul 26, 1985May 2, 1985—
00May 29, 1985May 2, 1985—
00May 25, 1985——
00Sep 20, 1984Jul 27, 1984—
00Sep 19, 1984Jul 27, 1984—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/21330410, documented in the API reference.