WELL · 42-213-30940 · DISTRICT 5
Mitchell J. #1
Henderson County · Thomas Lake (Rodessa B) field · Producing · Vertical
Mitchell J. #1 (API 42-213-30940) is a well in Henderson County operated by Southwest Operating Inc.-Tyler, completed November 21, 2007 and listed as producing on the RRC schedule.
The RRC has issued one drilling permit, issued November 6, 2007, permitted to 8,800 ft.
Completion filings report 4 formation tops, including Austin Chalk, Woodbine, Goodland, Base Of Mass..
Its lease has reported 25.2K barrels of oil and 189 mcf of gas since November 2007, last reporting in July 2026.
Operator of record
Southwest Operating Inc.-Tyler
- Based in
- Tyler, TX
- P-5 status
- Active – Extension (X)
- P-5 last filed
- Mar 4, 2026
- Permits on file
- 63
- Phone
- (903) 597-4279
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Southwest Operating Inc.-Tyler |
| Production reports | Southwest Operating, Inc.-Tylerthrough Oct 2025 |
| Latest permit | Southwest Operating, Inc.-TylerNov 6, 2007 |
- 8,800
- total depth, ft
- 1
- permits on file
- Nov 6, 2007
- last permit issued
- Nov 21, 2007
- completed
- 25.2K
- cumulative oil, bbl
- 189
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Nov 2007 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Nov 21, 2007
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active – Extension (X)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Mitchell, J. O-5-3864 | Thomas Lake (Rodessa B) | Southwest Operating, Inc.-Tyler | 1 | 25.2K | 189 | Nov 2007 – Jul 2026 |
Oil, barrels lease total
Last 12 months 381 · prior 12 859(-56%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Southwest Operating, Inc.-TylerFeb 2008 → Oct 2025
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 648680-99 | Drill | Southwest Operating, Inc.-Tyler | Oct 30, 2007 | Nov 6, 2007 | Nov 7, 2007 | 8,800 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-5-3864 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 469 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Austin ChalkBASE OF AUSTIN CHALK | 3,960 | -3,491 |
| Woodbine | 4,410 | -3,941 |
| Goodland | 5,920 | -5,451 |
| Base of Mass. | 8,306 | -7,837 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 8,384 | 8,402 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 885 | 11 | 258 S |
| 4.5 | 8,550 | 7.875 | 250 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Sep 16, 2008 | Mar 31, 2008 | Yes |
| 00 | Apr 21, 2008 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-213-30940 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-213-30940 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/21330940, documented in the API reference.