WELL · 42-215-00698 · DISTRICT 4
Jackson, Chandler #2
Hidalgo County · Vertical
Jackson, Chandler #2 (API 42-215-00698) is a permitted well in Hidalgo County filed by Penn Virginia Oil & Gas Corp.; no completion report is on file yet.
The RRC has issued 3 drilling permits between 1994 and 2003, permitted to 9,000 ft.
Operator of record
- Based in
- Houston, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- Jul 29, 2004
- Permits on file
- 86
- Phone
- (713) 722-6509
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Penn Virginia Oil & Gas Corp.through Mar 2004 |
| Latest permit | Penn Virginia Oil & Gas Corp.Oct 22, 2003 |
- 9,000
- total depth, ft
- 3
- permits on file
- Oct 22, 2003
- last permit issued
- —
- completed
- 0
- cumulative oil, bbl
- 532K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Jackson, Chandler G-4-173028 | Monte Christo, North (F-15) | Hilcorp Energy Company | 1 | 0 | 212K | Feb 1999 – Jul 2026 |
| Jackson, Chandler G-4-41389 | Monte Christo, N. (F-17, Lower) | Synergy Oil & Gas, Inc. (A) | 1 | 0 | 320K | Jan 1993 – Feb 1999 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Fina Oil & Chemical CompanyJan 1993 → Nov 1994
- 2Synergy Production CompanyDec 1994 → Jan 1996
- 3Synergy Oil & Gas, Inc. (A)Feb 1996 → Aug 2001
- 4Penn Virginia Oil & Gas Corp.Sep 2001 → Mar 2004
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 536832-99 | Recompletion | Penn Virginia Oil & Gas Corp. | Sep 25, 2003 | Oct 22, 2003 | — | 9,000 |
| 480044-99 | Recompletion | Synergy Oil & Gas, Inc. (A) | Oct 9, 1998 | Nov 5, 1998 | Jan 29, 1999 | 9,000 |
| 424968-99 | Recompletion | Fina Oil & Chemical Company | Jul 5, 1994 | Jul 21, 1994 | — | 8,900 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-4-41389 | — | — | — | — |
| — | — G-4-173028 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 8,820 | 8,840 | Perforated |
| 8,936 | 8,970 | Perforated |
| 9,044 | 9,308 | Perforated |
| 9,336 | 9,406 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 2,009 | 15 | 650 S |
| 7.625 | 8,448 | 9.875 | 350 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jul 15, 1999 | Mar 5, 1999 | Yes |
| 00 | Jun 10, 1999 | — | — |
| 00 | May 22, 1989 | Mar 31, 1989 | — |
| 00 | Jan 12, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-215-00698 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-215-00698 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/21500698, documented in the API reference.