WELL · 42-215-00765 · DISTRICT 4

West Temple W. Etal #5

Plugged

Hidalgo County · Tabasco (Consolidated) field  · Vertical

West Temple W. Etal #5 (API 42-215-00765) is a plugged well in Hidalgo County, plugged July 7, 2009, last operated by Hilcorp Energy Company.

The RRC has issued 2 drilling permits between 1995 and 1997, permitted to 6,312 ft.

It was permitted by Vastar Resources, Inc. and has since transferred to Hilcorp Energy Company on the wellbore schedule.

Its 4 leases have reported 99.3K barrels of oil and 385K mcf of gas since January 1993, last reporting in July 2026. The leases carry 6 wells, so these are lease totals, not this well alone.

Operator of record

Hilcorp Energy Company

Permitted by Vastar Resources, Inc.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active – Extension (X)
P-5 last filed
Mar 27, 2026
Permits on file
3,454
Phone
(713) 209-2400

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHilcorp Energy Company
Production reportsFidelity Explor. & Prod. Co.through Oct 2010
Latest permitVastar Resources, Inc.Aug 25, 1997

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,312
total depth, ft
2
permits on file
Aug 25, 1997
last permit issued
Sep 7, 2000
completed
99.3K
cumulative oil, bbl
385K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Sep 7, 2000
Shut in
—
Plugged
Jul 7, 2009

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 4 leases this well is completed on; they carry 6 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
West, Temple W.,etal O-4-13347Tabasco (Consolidated)Hilcorp Energy Company313.8K11.7KMar 2006 – Jul 2026
West, Temple W., Etal O-4-12697Tabasco (F Sand)Fidelity Explor. & Prod. Co.185.5K95.1KAug 1997 – Apr 2006
West, Temple W., et AL G-4-155447Tabasco (G 1)Vastar Resources, Inc.10279KJul 1995 – Aug 1997
West, Temple W., Etal O-4-3125Tabasco (Heard FB 3)Vastar Resources, Inc.100Jan 1993 – Oct 1995

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Vastar Resources, Inc.Jul 1995 → Jan 1999
  2. 2Smith Production Inc.Feb 1999 → May 2004
  3. 3Fidelity Explor. & Prod. Co.Jul 2008 → Oct 2010

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
466669-99RecompletionVastar Resources, Inc.Aug 25, 1997Aug 25, 1997Aug 21, 19976,312
437213-99RecompletionVastar Resources, Inc.Jun 23, 1995Jun 23, 1995Jun 13, 19956,312

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-4-155447————
—— O-4-3125————
—— O-4-12697————
—— O-4-13347————

Perforations

Perforated and open-hole intervals.

FromToType
5,0405,052Perforated
5,0525,040Perforated
5,2505,262Perforated
—6,257Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,120—432 S
9.6251,165——
2.3756,285——
5.56,304——
5.56,312—225 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Apr 13, 2006Sep 14, 2000—
00Nov 27, 2000Sep 14, 2000—
00Nov 4, 1997Sep 3, 1997Yes
00Sep 22, 1997——
00Dec 12, 1995Jul 28, 1995Yes
00Oct 3, 1995——
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/21500765, documented in the API reference.