TEXAS · WELLS · HIDALGO COUNTY · API 42-215-00862 · DISTRICT 04
Evans William #1
Hidalgo County · San Salvador (7700) field · Vertical
Evans William #1 (API 42-215-00862) is a plugged well in Hidalgo County, plugged December 22, 1971, last operated by Arco Oil & Gas CO..
The RRC has issued one drilling permit, issued April 5, 1989, permitted to 8,200 ft.
It was permitted by Texas Fuel Company and has since transferred to Arco Oil & Gas CO. on the wellbore schedule.
Operator of record
Permitted by Texas Fuel Company; the EWA schedule now lists a different operator.
- Based in
- Plano, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- Nov 23, 2004
- Permits on file
- 3,065
- Phone
- (972) 509-7001
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Arco Oil & Gas Co. |
| Production reports | none |
| Latest permit | Texas Fuel CompanyApr 5, 1989 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 8,200
- total depth, ft
- 1
- permits on file
- Apr 5, 1989
- last permit issued
- Dec 22, 1959
- completed
- —
- cumulative oil, bbl
- —
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Dec 22, 1959
- Shut in
- —
- Plugged
- Dec 22, 1971
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 356865-99 | Reenter | Texas Fuel Company | Mar 13, 1989 | Apr 5, 1989 | — | 8,200 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Dec 22, 1959 | Evans William G-4-14026 | San Salvador (7700) | Arco Oil & Gas Co. | Plugged | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 7,750 | 7,757 | Perforated |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 12, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-215-00862 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-215-00862 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.