WELL · 42-215-01035 · DISTRICT 4

Fee No. 827 Unit #2

Plugged

Hidalgo County · San Carlos (FF-18) field  · Vertical

Fee NO. 827 Unit #2 (API 42-215-01035) is a plugged well in Hidalgo County, plugged December 11, 2013, last operated by Merit Energy Company.

The RRC has issued one drilling permit, issued October 2, 1995, permitted to 7,450 ft.

Completion filings report 4 formation tops, including Fe 93, Fe 81, Ff 2, Ff 18.

Operator of record

Merit Energy Company

Based in
Dallas, TX
P-5 status
Active (A)
P-5 last filed
Nov 7, 2025
Permits on file
1,049
Phone
(972) 701-8377

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleMerit Energy Company
Production reportsMcDaniel Company, Inc., Thethrough Sep 2013
Latest permitMerit Energy CompanyOct 2, 1995

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

7,450
total depth, ft
1
permits on file
Oct 2, 1995
last permit issued
Nov 4, 1959
completed
0
cumulative oil, bbl
579K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Dec 2013

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Nov 4, 1959
Shut in
—
Plugged
Dec 11, 2013

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 4 leases this well is completed on; they carry 4 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Fee No. 827 Unit G-4-13907San Carlos (FE-81)McDaniel Company, Inc., The100Jan 1993 – Dec 2013
Fee No. 827 Unit G-4-157113San Carlos (FD-93)McDaniel Company, Inc., The10579KJan 1996 – Dec 2013
Fee 827 Unit G-4-13914San Carlos (FF- 2)Merit Energy Company100Jan 1993 – Jan 1996
Fee No. 827 Unit G-4-13919San Carlos (FF-18)Merit Energy Company100Jan 1993 – Jan 1996

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Merit Energy CompanyJan 1996 → Jul 1999
  2. 2Coastal Oil & Gas CorporationAug 1999 → Jun 2001
  3. 3EL Paso Production Oil & Gas Co.Jul 2001 → Mar 2002
  4. 4United Oil & Minerals L. P.Jun 2002 → Jun 2003
  5. 5United Resources, LPJul 2003 → Nov 2003
  6. 6Westport Oil and Gas Company, LPMar 2004 → Nov 2005
  7. 7Houston Exploration Company, TheDec 2005 → Jun 2007
  8. 8Forest Oil CorporationJul 2007 → Nov 2010
  9. 9McDaniel Company, Inc., TheDec 2010 → Sep 2013

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
439127-99RecompletionMerit Energy CompanyAug 21, 1995Oct 2, 1995Oct 2, 19957,450

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-4-13907————
—— G-4-13914————
—— G-4-13919————
—— G-4-157113————

Formation tops

As filed on W-2/G-1. Subsea from 84 ft elevation.Download CSV →

FormationMD ftSubsea
FE 937,105-7,021
FE 817,555-7,471
FF 27,678-7,594
FF 187,751-7,667

Perforations

Perforated and open-hole intervals.

FromToType
7,1057,120Perforated
7,1227,132Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,722——
9.6251,73512.25795 S
5.57,9338.75500 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 26, 1996Feb 12, 1996Yes
00Mar 11, 1996——
00Jan 12, 1984Nov 18, 1959—
00Jan 12, 1984Nov 4, 1959—
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/21501035, documented in the API reference.