WELL · 42-215-01360 · DISTRICT 4

Pharr Fieldwide Unit #15

Plugged

Hidalgo County · Pharr (8500) field  · Vertical

Pharr Fieldwide Unit #15 (API 42-215-01360) is a plugged well in Hidalgo County, plugged December 20, 2002, last operated by Total E&P USA Inc..

The RRC has issued 3 drilling permits (amended once) between 1977 and 1999, permitted to 10,606 ft.

It was permitted by Fina Oil & Chemical Company and has since transferred to Total E&P USA Inc. on the wellbore schedule.

Operator of record

Total E&P USA Inc.

Permitted by Fina Oil & Chemical Company; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Inactive (I)
P-5 last filed
Sep 9, 2016
Permits on file
74
Phone
(713) 647-3000

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTotal E&P USA Inc.
Production reportsTotalfinaelf E&P USA Incthrough Jun 2001
Latest permitFina Oil & Chemical CompanyMay 26, 1999

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

10,606
total depth, ft
4
permits on file
May 26, 1999
last permit issued
Jun 2, 1999
completed
0
cumulative oil, bbl
476K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Dec 2002

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jun 2, 1999
Shut in
—
Plugged
Dec 20, 2002

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 4 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Pharr Fieldwide Unit G-4-12527Pharr (FB-L, Marks)Totalfinaelf E&P USA Inc100Jan 1993 – Dec 2002
Pharr Fieldwide Unit G-4-173403Pharr (8500)Totalfinaelf E&P USA Inc10254KJun 1999 – Dec 2002
Pharr Fieldwide Unit G-4-136858Pharr(hanson)Fina Oil & Chemical Company10222KJan 1993 – Sep 1999
— G-4-76799——000—

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Fina Oil & Chemical CompanyJan 1993 → Nov 2000
  2. 2Totalfinaelf E&P USA IncJan 2001 → Jun 2001

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
484745-99RecompletionFina Oil & Chemical CompanyMay 24, 1999May 26, 1999Nov 24, 19989,058
379155-98RecompletionFina Oil & Chemical CompanyDec 21, 1990Oct 12, 1990Nov 1, 199010,606
379155-99RecompletionFina Oil & Chemical CompanyOct 9, 1990Oct 12, 1990—10,606
11557-99RecompletionTenneco Oil Co.Nov 8, 1977Nov 8, 1977—10,350

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-4-12527————
—— G-4-76799————
—— G-4-136858————
—— G-4-173403————

Perforations

Perforated and open-hole intervals.

FromToType
8,8398,842Perforated
8,8548,872Perforated
8,8828,894Perforated
8,9018,906Perforated
8,9348,942Perforated
9,1519,450Perforated
10,43410,478Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.751,334——
10.751,35313.375900 S
10.751,35414.75900 S
78,4859.8751,647 S
78,4869.8751,589 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 19, 1999Jul 1, 1999Yes
00Jul 9, 1999——
00Apr 10, 1991Jan 29, 1991Yes
00Feb 12, 1991——
00Jan 12, 1984Jun 7, 1978—
00Jan 12, 1984Jun 8, 1962Yes
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/21501360, documented in the API reference.