WELL · 42-215-01389 · DISTRICT 4

Pharr Fieldwide Unit #5

Plugged

Hidalgo County · Pharr (Marks) field  · Vertical

Pharr Fieldwide Unit #5 (API 42-215-01389) is a plugged well in Hidalgo County, plugged December 19, 2001, last operated by Totalfinaelf E&P USA Inc.

The RRC has issued one drilling permit, issued February 23, 1995, permitted to 10,150 ft.

It was permitted by Fina Oil & Chemical Company and has since transferred to Totalfinaelf E&P USA Inc on the wellbore schedule.

Completion filings report one formation top, including Pharr (Hanson).

Operator of record

Totalfinaelf E&P USA Inc

Permitted by Fina Oil & Chemical Company; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Inactive (I)
P-5 last filed
Dec 18, 2002
Permits on file
138
Phone
(713) 647-3559

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTotalfinaelf E&P USA Inc
Production reportsTotalfinaelf E&P USA Incthrough Feb 2001
Latest permitFina Oil & Chemical CompanyFeb 23, 1995

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

10,150
total depth, ft
1
permits on file
Feb 23, 1995
last permit issued
Mar 20, 1995
completed
0
cumulative oil, bbl
420K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Mar 1995 THROUGH Dec 2001

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Mar 20, 1995
Shut in
—
Plugged
Dec 19, 2001

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Pharr Fieldwide Unit G-4-157518Pharr (Marks)Totalfinaelf E&P USA Inc10420KMar 1995 – Dec 2001

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Fina Oil & Chemical CompanyMar 1995 → Sep 2000
  2. 2Totalfinaelf E&P USA IncFeb 2001 → Feb 2001

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
433105-99ReenterFina Oil & Chemical CompanyFeb 21, 1995Feb 23, 1995Oct 14, 199410,150

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-4-157518————

Formation tops

As filed on W-2/G-1. Download CSV →

FormationMD ft
Pharr (Hanson)9,525

Perforations

Perforated and open-hole intervals.

FromToType
9,9429,980Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.751,26812.25700 S
10.751,268——
13.3752,500—1,800 S
9.6257,942—1,500 S
7.6258,389——
7.6258,4899.875500 S
5.59,302—1,000 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 10, 1996Jan 22, 1996Yes
00Apr 5, 1996——
00Jan 12, 1984Nov 11, 1968—
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/21501389, documented in the API reference.