WELL · 42-215-01539 · DISTRICT 4

Keirn Pearl #1

Plugged

Hidalgo County · McAllen (F-1) field  · Vertical

Keirn Pearl #1 (API 42-215-01539) is a plugged well in Hidalgo County, plugged January 14, 2002, last operated by Totalfinaelf E&P USA Inc.

The RRC has issued one drilling permit, issued May 25, 1999, permitted to 6,193 ft.

It was permitted by Fina Oil & Chemical Company and has since transferred to Totalfinaelf E&P USA Inc on the wellbore schedule.

Operator of record

Totalfinaelf E&P USA Inc

Permitted by Fina Oil & Chemical Company; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Inactive (I)
P-5 last filed
Dec 18, 2002
Permits on file
138
Phone
(713) 647-3559

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleFina Oil & Chemical Company
Production reportsTotalfinaelf E&P USA Incthrough Dec 2001
Latest permitFina Oil & Chemical CompanyMay 25, 1999

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,193
total depth, ft
1
permits on file
May 25, 1999
last permit issued
Jun 7, 1999
completed
0
cumulative oil, bbl
860K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jan 2002

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jun 7, 1999
Shut in
—
Plugged
Jan 14, 2002

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Keirn, Pearl G-4-173985McAllen (F-1)Totalfinaelf E&P USA Inc10549KJun 1999 – Jan 2002
Keirn, Pearl, Unit G-4-11901McAllen (Keirn 6100)Fina Oil & Chemical Company10311KJan 1993 – Sep 1999

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Fina Oil & Chemical CompanyJan 1993 → Dec 2000
  2. 2Totalfinaelf E&P USA IncJan 2001 → Dec 2001

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
484749-99RecompletionFina Oil & Chemical CompanyMay 24, 1999May 25, 1999May 28, 19996,193

Completions

CompletedLeaseFieldOperatorStatusDepth
Jun 7, 1999Keirn Pearl G-4-173985McAllen (F-1)Totalfinaelf E&P USA IncPlugged—
Oct 29, 1960Keirn Pearl Unit G-4-11901McAllen (Keirn 6100)Fina Oil & Chemical CompanyPlugged—

Perforations

Perforated and open-hole intervals.

FromToType
5,8145,844Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.751,281——
13.3751,29618.51,050 S
8.6258,09811900 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Sep 21, 1999Aug 26, 1999Yes
00Sep 2, 1999——
00Jan 12, 1984Nov 9, 1960—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/21501539, documented in the API reference.