WELL · 42-215-01608 · DISTRICT 4

West Temple W. Etal #15

Plugged

Hidalgo County · Tabasco (Heard FB 2) field  · Vertical

West Temple W. Etal #15 (API 42-215-01608) is a plugged well in Hidalgo County, plugged November 15, 1994, last operated by Smith Production Inc..

The RRC has issued one drilling permit (amended once), issued September 4, 1991, permitted to 6,300 ft.

It was permitted by Arco Oil & Gas CO. and has since transferred to Smith Production Inc. on the wellbore schedule.

Completion filings report 3 formation tops, including F Sand, H Sand, Heard Sand.

Operator of record

Smith Production Inc.

Permitted by Arco Oil & Gas Co.; the EWA schedule now lists a different operator.

Based in
The Woodlands, TX
P-5 status
Active (A)
P-5 last filed
Nov 12, 2025
Permits on file
433
Phone
(281) 296-5600

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleSmith Production Inc.
Production reportsnone
Latest permitArco Oil & Gas Co.Sep 4, 1991

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,300
total depth, ft
2
permits on file
Sep 4, 1991
last permit issued
May 29, 1953
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Nov 1999

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
May 29, 1953
Shut in
—
Plugged
Nov 15, 1994

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 7 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
West, Temple W., Etal O-4-3123Tabasco (Heard FB 2)Smith Production Inc.600Jan 1993 – Nov 1999
West, Temple W. O-4-12271WildcatVastar Resources, Inc.100May 1993 – Dec 1994

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
391495-98RecompletionArco Oil & Gas Co.Mar 29, 1993Sep 4, 1991Apr 15, 19936,300
391495-99RecompletionArco Oil & Gas Co.Aug 30, 1991Sep 4, 1991—6,300

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-4-3123————
—— O-4-12271————

Formation tops

As filed on W-2/G-1. Subsea from 14 ft elevation.Download CSV →

FormationMD ftSubsea
F Sand5,035-5,021
H Sand5,275-5,261
Heard Sand6,075-6,061

Perforations

Perforated and open-hole intervals.

FromToType
6,0766,134Perforated
—6,020Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.751,105——
10.751,120——
2.3756,162——
5.56,278——
5.56,290——

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Dec 21, 1993Oct 25, 1993Yes
00Nov 3, 1993Nov 21, 1991—
00Feb 28, 1992Nov 21, 1991—
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/21501608, documented in the API reference.