WELL · 42-215-30200 · DISTRICT 4

Rentfro Russell #3

Shut in

Hidalgo County · Jeffress N (Vksbg LO) field · Temp Abandoned  · Vertical

Rentfro Russell #3 (API 42-215-30200) is a well in Hidalgo County operated by Mountain V Texas LLC, completed November 29, 2000 and listed as temp abandoned on the RRC schedule, shut in April 1, 2020.

The RRC has issued 4 drilling permits between 1994 and 2003, permitted to 12,869 ft.

It was permitted by Chevron U. S. A. Inc. and has since transferred to Mountain V Texas LLC on the wellbore schedule.

No lease production has been reported under this well’s leases.

Operator of record

Mountain V Texas LLC

Permitted by Chevron U. S. A. Inc.; the EWA schedule now lists a different operator.

Based in
Buckhannon, WV
P-5 status
Active (A)
P-5 last filed
Sep 11, 2025
Phone
(304) 842-6320

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsXTO Energy Inc.through Mar 2020
Latest permitChevron U. S. A. Inc.Aug 11, 2003
12,869
total depth, ft
4
permits on file
Aug 11, 2003
last permit issued
Nov 29, 2000
completed
0
cumulative oil, bbl
3.87M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Nov 29, 2000
Shut in
Apr 1, 2020
Plugged
—

Operator's P-5 on the schedule: Active – Extension (X)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Rentfro, Russell G-4-55065Jeffress (Vicksburg V)Vantage Operating, LLC10347KJan 1993 – Jul 2026
Rentfro, Russell G-4-180774Jeffress (Vicksburg T)Vantage Operating, LLC10186KNov 2000 – Jul 2026
Rentfro, Russell G-4-149004Jeffress (Vicksburg U)Texaco E & P Inc.103.34MMar 1994 – Nov 2000

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Texaco E & P Inc.Jan 1993 → Apr 2002
  2. 2Chevron U. S. A. Inc.Aug 2002 → Jul 2004
  3. 3XTO Energy Inc.Aug 2004 → Mar 2020

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
535140-99Field transferChevron U. S. A. Inc.Aug 11, 2003Aug 11, 2003Nov 17, 200012,869
522209-99RecompletionChevron U. S. A. Inc.Jul 26, 2002Aug 21, 2002—12,869
501546-99RecompletionTexaco E & P Inc.Nov 2, 2000Nov 6, 2000Nov 17, 200012,869
421795-99RecompletionTexaco E & P Inc.Mar 7, 1994Mar 9, 1994Mar 8, 199412,869

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-4-55065————
—— G-4-149004————
—— G-4-180774————

Perforations

Perforated and open-hole intervals.

FromToType
10,42210,466Perforated
11,13611,196Perforated
11,26611,326Perforated
11,55711,733Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.3751,63317.51,025 S
9.6256,24312.25700 S
5.512,8626.625—
5.512,8696.625800 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Oct 3, 2003Aug 18, 2003—
00Apr 4, 2001Feb 2, 2001—
00Mar 31, 2001Jan 25, 2001Yes
00Feb 15, 2001——
00Jun 14, 1994Apr 4, 1994Yes
00May 6, 1994——
00Apr 30, 1993Apr 15, 1993—
00Jan 12, 1984Apr 30, 1973—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/21530200, documented in the API reference.