TEXAS · WELLS · HIDALGO COUNTY · JOHNSON,FLORA I. LEASE · API 42-215-30379 · DISTRICT 04

Johnson Flora I. #1

Plugged

Hidalgo County · Monte Christo S. (Vicks. Cons.) field  · Vertical

Johnson Flora I. #1 (API 42-215-30379) is a plugged well in Hidalgo County, plugged May 1, 2018, last operated by Merit Energy Company.

The RRC has issued 3 drilling permits between 1977 and 1984, permitted to 9,414 ft.

It was permitted by Tana Oil & Gas Corp. and has since transferred to Merit Energy Company on the wellbore schedule.

Operator of record

Merit Energy Company

Permitted by Tana Oil & Gas Corp.; the EWA schedule now lists a different operator.

Based in
Dallas, TX
P-5 status
Active (A)
P-5 last filed
Nov 7, 2025
Permits on file
1,049
Phone
(972) 701-8377

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleMerit Energy Company
Production reportsnone
Latest permitTana Oil & Gas Corp.Dec 21, 1984

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

9,414
total depth, ft
3
permits on file
Dec 21, 1984
last permit issued
Feb 6, 1985
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH —

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Feb 6, 1985
Shut in
—
Plugged
May 1, 2018

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Johnson,flora I. G-4-75134Monte Christo, S. (Vicks. Cons.)Merit Energy Company100Jan 1993 – —

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
261840-99RecompletionTana Oil & Gas Corp.Nov 15, 1984Dec 21, 1984—9,414
125582-99RecompletionTana Oil & Gas Corp.Jul 17, 1981Jul 17, 1981—9,414
14262-99OtherTana Oil & Gas Corp.Dec 19, 1977Dec 19, 1977—9,037

Completions

CompletedLeaseFieldOperatorStatusDepth
Feb 6, 1985Johnson Flora I. G-4-75134Monte Christo S. (Vicks. Cons.)Merit Energy CompanyPlugged—
Feb 6, 1985Johnson Flora I. G-4-75134Monte Christo S. (Vicks. Cons.)Merit Energy CompanyPlugged—
—Johnson Flora I G-4-67140Monte Christo South (9000)Tana Oil & Gas CorporationPlugged—

Perforations

Perforated and open-hole intervals.

FromToType
6,0526,072Perforated
6,1006,170Perforated
6,1506,190Perforated
6,1806,190Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,00012.25380 S
9.6251,01012.25380 S
4.59,0657.8752,845 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Jun 28, 1994Apr 14, 1994—
00May 20, 1991Mar 13, 1991—
00Jan 30, 1986Jan 7, 1986—
00Jan 12, 1984Feb 21, 1978—
00Jan 12, 1984Jul 20, 1976—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
1.19M
bbl, all reported
Sep 2018
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000060192W-14 DisposalPlugged May 14, 20188002,5505,100–6,190

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 8,608(-100%)

05001K1.5K20172018

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.