TEXAS · WELLS · HIDALGO COUNTY · MCALLEN, A. A. LEASE · API 42-215-30421 · DISTRICT 04

McAllen A. A. #14

Shut in

Hidalgo County · McAllen Ranch (Vksbg P-V S Cons) field · Temp Abandoned  · Vertical

Mcallen A. A. #14 (API 42-215-30421) is a well in Hidalgo County operated by Hilcorp Energy Company, completed December 12, 1992 and listed as temp abandoned on the RRC schedule, shut in January 1, 1998.

The RRC has issued 3 drilling permits between 1977 and 1992, permitted to 15,750 ft.

It was permitted by Forest Oil Corp. and has since transferred to Hilcorp Energy Company on the wellbore schedule.

No lease production has been reported under this well’s leases.

Operator of record

Hilcorp Energy Company

Permitted by Forest Oil Corp.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active – Extension (X)
P-5 last filed
Mar 27, 2026
Permits on file
3,454
Phone
(713) 209-2400

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHilcorp Energy Company
Production reportsForest Oil Corporationthrough Jan 1995
Latest permitForest Oil Corp.Sep 14, 1992

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

15,750
total depth, ft
3
permits on file
Sep 14, 1992
last permit issued
Dec 12, 1992
completed
0
cumulative oil, bbl
435K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Dec 12, 1992
Shut in
Jan 1, 1998
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
McAllen, A. A. G-4-124363McAllen Ranch (Vksbg P-V,s Cons)Hilcorp Energy Company10435KJan 1993 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Forest Oil CorporationJan 1993 → Jan 1995

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
403277-99RecompletionForest Oil Corp.Sep 9, 1992Sep 14, 1992Nov 11, 199213,242
325969-99RecompletionForest Oil Corp.Jan 29, 1987Feb 2, 1987—14,500
10539-99DrillForest Oil Corp.Oct 24, 1977Oct 24, 1977—15,750

Completions

CompletedLeaseFieldOperatorStatusDepth
Dec 12, 1992McAllen A. A. G-4-124363McAllen Ranch (Vksbg P-V S Cons)Hilcorp Energy CompanyTemp Abandoned · shut in Jan 1, 199815,750
Dec 12, 1992McAllen A. A. G-4-124363McAllen Ranch (Vksbg P-V S Cons)Hilcorp Energy CompanyTemp Abandoned · shut in Jan 1, 199815,750
—McAllen A.A. G-4-72992McAllen Ranch (Vicksburg Y)Forest Oil CorporationNot on Schedule—

Perforations

Perforated and open-hole intervals.

FromToType
12,52612,532Perforated
12,54412,568Perforated
12,58212,602Perforated
12,97213,188Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.3751,75317.5950 S
9.6259,21812.25500 S
7.6259,21812.25500 S
5.515,4118.5560 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Feb 4, 1993Jan 4, 1993Yes
00Aug 14, 1987Jul 15, 1987—
00Jul 24, 1987Jun 18, 1987Yes
00Jul 1, 1987——
00Jan 12, 1984Oct 3, 1977—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/21530421, documented in the API reference.