TEXAS · WELLS · HIDALGO COUNTY · MCALLEN, A.A. (SWD) LEASE · API 42-215-30918 · DISTRICT 04

McAllen A.A. (SWD) #61

Plugged

Hidalgo County · McAllen Ranch (Vicksburg R-3) field  · Vertical

Mcallen A.A. (Swd) #61 (API 42-215-30918) is a plugged well in Hidalgo County, plugged December 18, 1997, last operated by Shell Western E&P Inc..

The RRC has issued 4 drilling permits (amended once) between 1979 and 1989, permitted to 12,950 ft.

Completion filings report one formation top, including Vicksburg.

Operator of record

Shell Western E&P Inc.

Based in
Houston, TX
P-5 status
Inactive (I)
P-5 last filed
Sep 16, 1999
Permits on file
2,528
Phone
(281) 544-3215

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitShell Western E&P Inc.Apr 5, 1989
12,950
total depth, ft
5
permits on file
Apr 5, 1989
last permit issued
Jul 25, 1990
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Dec 1997

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jul 25, 1990
Shut in
—
Plugged
Dec 18, 1997

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
McAllen, A.A. (SWD) G-4-130065McAllen Ranch (Vicksburg R-3)Shell Western E&P Inc.100Jan 1993 – Dec 1997

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
357756-99RecompletionShell Western E&P Inc.Apr 4, 1989Apr 5, 1989—12,950
355596-99RecompletionShell Western E&P Inc.Jan 27, 1989Jan 31, 1989—12,950
345612-98ReenterShell Western E&P Inc.Oct 21, 1988Apr 26, 1988—12,950
345612-99ReenterShell Western E&P Inc.Apr 25, 1988Apr 26, 1988—12,950
46257-99DrillShell Oil CompanyApr 12, 1979Apr 12, 1979Jul 30, 197912,950

Completions

CompletedLeaseFieldOperatorStatusDepth
Jul 25, 1990McAllen A.A. (SWD) G-4-130065McAllen Ranch (Vicksburg R-3)Shell Western E&P Inc.Plugged—
Aug 12, 1988McAllen A.A. G-4-128751McAllen Ranch (Vicksburg S)Shell Western E&P Inc.Plugged—

Formation tops

As filed on W-2/G-1. Subsea from 233 ft elevation.Download CSV →

FormationMD ftSubsea
VicksburgVICKSBURG N10,111-9,878
VicksburgVICKSBURG N.10,111-9,878
VicksburgVICKSBURG R10,900-10,667
VicksburgVICKSBURG R.10,900-10,667
VicksburgVICKSBURG S12,700-12,467

Perforations

Perforated and open-hole intervals.

FromToType
4,1904,224Perforated
4,2364,260Perforated
4,2644,290Perforated
11,66211,695Perforated
11,71511,734Perforated
12,69812,815Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
161,741201,220 S
11.758,62414.751,030 S
512,9248.51,350 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 1, 1991Feb 21, 1991—
00Apr 4, 1989Mar 9, 1989Yes
00Mar 18, 1989——
00Dec 5, 1988Oct 27, 1988Yes
00Nov 4, 1988——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
258K
bbl, all reported
Jan 1998
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000076728W-14 DisposalPlugged Jan 20, 19981,5001,8003,750–4,310

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 16,533(-100%)

05K10K15K19971998

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/21530918, documented in the API reference.