WELL · 42-215-30928 · DISTRICT 4
West, T. W. #30
Hidalgo County · Vertical
West, T. W. #30 (API 42-215-30928) is a permitted well in Hidalgo County filed by Vastar Resources, Inc.; no completion report is on file yet.
The RRC has issued 3 drilling permits (amended once) between 1979 and 1996, permitted to 8,605 ft.
Operator of record
- Based in
- Houston, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- Oct 30, 2001
- Permits on file
- 328
- Phone
- (281) 366-7061
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Fidelity Explor. & Prod. Co.through Dec 2008 |
| Latest permit | Vastar Resources, Inc.Apr 22, 1996 |
- 8,605
- total depth, ft
- 4
- permits on file
- Apr 22, 1996
- last permit issued
- —
- completed
- 0
- cumulative oil, bbl
- 497K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Apr 2010
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| West, Temple W. G-4-89548 | Tabasco (O Seg 1) | Fidelity Explor. & Prod. Co. | 1 | 0 | 497K | Jan 1993 – Apr 2010 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Arco Oil & Gas Co.Jan 1993 → Feb 1994
- 2Vastar Resources, Inc.Mar 1994 → Jan 1999
- 3Smith Production Inc.Feb 1999 → Apr 2005
- 4Fidelity Explor. & Prod. Co.May 2005 → Dec 2008
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 447250-99 | Recompletion | Vastar Resources, Inc. | Apr 19, 1996 | Apr 22, 1996 | — | 8,605 |
| 54433-98 | Drill | Vastar Resources, Inc. | Oct 6, 1994 | Jul 30, 1979 | — | 8,605 |
| 54433-99 | Drill | Arco Oil & Gas Co. | Jul 30, 1979 | Jul 30, 1979 | Aug 4, 1979 | 8,500 |
| 49023-99 | Drill | Arco Oil & Gas Co. | May 23, 1979 | May 23, 1979 | Aug 4, 1979 | 8,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-4-89548 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 5,197 | 5,210 | Perforated |
| 5,218 | 5,223 | Perforated |
| 5,278 | 5,304 | Perforated |
| 5,310 | 5,323 | Perforated |
| 5,352 | 5,360 | Perforated |
| 5,548 | 5,555 | Perforated |
| 6,005 | 6,060 | Perforated |
| 6,758 | 6,784 | Perforated |
| 6,772 | 6,841 | Perforated |
| 6,788 | 6,806 | Perforated |
| 8,030 | 8,054 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 1,998 | 14.75 | 990 S |
| 10.75 | 2,001 | 14.75 | 990 S |
| 2.375 | 6,700 | — | — |
| 7.625 | 7,244 | 9.875 | 510 S |
| 2.375 | 7,850 | — | — |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jun 1, 2007 | May 21, 2007 | — |
| 00 | Mar 21, 2007 | Sep 5, 2006 | — |
| 00 | Feb 1, 1995 | Dec 12, 1994 | — |
| 00 | Jan 12, 1984 | Sep 19, 1980 | — |
| 00 | Jan 12, 1984 | Nov 7, 1979 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-215-30928 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-215-30928 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/21530928, documented in the API reference.